고흥사무소 · 계획설계 검토

Goheung Office, Rev.1

Rev.0 has the right basic layout and I'd keep it: one gable roof over the office, the glass room and the service wing, 99.40 ㎡ in total. What needs work is inside the bays: which way people sit, where visitors go, how pipes and ducts cross the glass bay, and what heats the floor. Rev.1 makes ten changes and adds elevations, a steel frame with insulated panels, services sheets for water, heating, power and lighting, and a page for monitoring and controlling the office from a phone. The envelope, the bay widths and the total area stay the same.

연면적
99.40 ㎡30.07평
태양광 데크
7.74 kWp645 W × 12
배터리
16 kWh한 줄 전원
변경
10Rev.0 대비
결정할 것
7A–G
Reviewed
고흥사무소_계획안.pdf · Rev.0 · 2026.10.23
Checked against
건축기준 memo, items 1–7
This revision
Rev.1 proposal · 2026.10.27
Unchanged
14,200 × 7,000 · 박공 20° · 99.40 ㎡ (30.07평)
Sheets
A-101 · A-201 · A-301 · A-401 · A-501 · S-101 · S-201 · S-301 · M-101 · M-102 · E-201 · E-301 · L-101 · C-001 · C-101
Research
조명 · 배터리 · 바닥재 (2026-10-27)
Appendix
Rev.1 sheet set, Rev.0 data, reference photos and all 12 PDF sheets
Rev.1

검토 · Review

What changes in Rev.1

Rev.0's layout stays. Ten changes deal with how people sit, where visitors go, how services cross the glass bay, how the building makes and stores power, and the solar deck. Seven decisions are yours.

Keep

What Rev.0 gets right

  • Three bays under one gable (7.1 / 3.8 / 3.3 m) meet every line of the memo: office 15.03평, service wing 6.99평, glass room in between.
  • The long sides face due south, so the whole south front gets sun all day. Rev.1 uses it for the solar deck (change 10).
  • The storage and mech-room doors open off the east gable. Deliveries and equipment checks never pass through the office.
  • The toilet opens off the lobby, so nobody has to walk through the office or the meeting room to reach it.
  • The materials follow your reference photos: grey standing-seam roof, red-brick gables, dark panel long walls.
A-1011층 평면도 · Floor plan
태양광 데크 Solar deckPV 캐노피 645 W × 12 = 7.74 kWp · 10°12345ABC문서 수납복합기·플로터탕비대표석청정제습가습2인 테이블사무실Office · 49.70㎡ · 15.03평신발장신발장현관 타일 · shoes off로비Lobby · 7.60㎡ · 천장 2,400천장 속 service bridge회의실Meeting · 19.00㎡AC세면WCWCHP 실내기분배기제어함분전반버퍼배터리인버터ERV기계·전기실창고Storage · 9.90㎡제습AC 실외기HP 실외기AC주출입 Entrance설비 점검자재 반입7,1003,8003,30014,2002,0005,0003,6007,000N0125m12345678910

Switch between the two revisions to compare. Circles mark a problem in Rev.0 and triangles mark the matching change in Rev.1. The numbers match the list below. The solar deck (about 50 ㎡, open on three sides) isn't floor area and isn't in the totals.

  • Rev.1 change  · Rev.0 problem
  • Lobby ceiling void used as the service bridge
  • Braced wall (typhoon bracing)
  • Ceiling-mounted unit (ERV, AC cassette)
  • Structural grid. Frames 3 and 4 bound the glass bay
  • Solar canopy over the deck, 12 modules, posts on grid line C
실 RoomRev.0 ㎡Rev.1 ㎡평
사무실 Office49.7049.7015.03
로비 Lobby9.127.602.30
회의실 Meeting17.4819.005.75
화장실 Toilet6.606.602.00
기계·전기실 Mech6.606.602.00
창고 Storage9.909.902.99
합계 Total99.4099.4030.07

Rev.1

Ten changes

Office · 사무실

  1. 1

    Turn the desks 90° to the window

    In Rev.0 the north row looks straight into the south window and the south row has it behind them, so one row squints and the other gets glare on their screens. Rev.1 runs the 3 + 3 island north–south, so everyone sits side-on to the window. The director still faces the room and the door.

  2. 2

    Close the west wall behind the director

    Rev.0 puts a window right behind the director's chair. Staff see a silhouette, and the low afternoon sun lands on the desk. Rev.1 makes the west gable solid brick, like the reference photos, and daylight comes from the 5.2 m south window and the north high window. A solid gable also gives the frame a wall to brace in (change 9).

  3. 3

    Meet visitors in the meeting room

    Rev.0's sofa is in the far south-west corner, so every visitor walks past all seven desks to reach it. The meeting room is right off the lobby, so Rev.1 drops the sofa and puts a two-seat table by the window for one-to-ones and calls.

Glass bay · 유리 회의공간

  1. 4

    Shorten the lobby and make the partition glass

    The memo's central idea is an open passage through the middle (가운데는 통로처럼 비운다). Rev.0's 2.1 m furniture wall blocks the view from the front door to the garden. Rev.1 moves the partition from 2.4 m to 2.0 m, in line with the toilet wall, and builds it in glass with one solid 1.6 m panel: TV on the meeting side, company sign on the lobby side. The meeting room grows from 17.48 to 19.00 ㎡ and the lobby shrinks from 9.12 to 7.60 ㎡.

  2. 5

    Use the lobby ceiling as a service bridge

    The outdoor units and the mech room are at the east end. The AC, the ERV outlets and most of the PoE sensors are in the office at the west end. In Rev.0 the whole glass bay has an exposed sloped ceiling, so refrigerant pipes, ducts and cables have nowhere to hide on the way across. Rev.1 gives the lobby a flat 2,400 ceiling and runs everything above it. Stepping from the low lobby into the 4.3 m meeting room also makes the room feel taller.

Services and energy · 설비

  1. 6

    Move the ERV out of the office ceiling

    Rev.0 hangs the ERV in the office ceiling beside the director's desk, so its fan runs over the people working. Rev.1 puts it in the roof space above the mech room, where the filters are changed through a hatch. The meeting room gets its air from a grille in the lobby bulkhead.

  2. 7

    Heat the floor with an air-to-water heat pump

    Keep the hot-water floor heating and the buffer tank, but heat the water with a heat pump instead of an electric boiler. It uses about a third of the electricity. An electric boiler sized for this floor would take most of the hybrid inverter's capacity on its own, while the heat pump draws about 2 kW. The numbers are in the table below.

  3. 8

    Panel, inverter and battery on one power line

    Rev.0 puts the 16 kWh battery against the meeting-room wall, with the inverter on the far side of the room. Rev.1 puts the panel, hybrid inverter and battery together on the east side beside the exterior door, with louvers in the east wall, and runs the whole building on one power line: mains into the inverter, the inverter into one panel. In a power cut everything stays on from the battery and solar, and the hub switches off the AC, heat pump and water heaters so the inverter isn't overloaded. The DC cable is short, and the battery can be reached from outside if anything goes wrong.

Structure and sun · 구조 · 일사

  1. 9

    Fix the frame lines before the structural review

    Rev.0 doesn't set a structural grid. Rev.1 uses steel portal frames on lines 1–5 (0 · 3,550 · 7,100 · 10,900 · 14,200). Frames 3 and 4 are hidden in the walls on either side of the glass bay, so the meeting room has no columns and the curtain walls carry no roof load. Typhoon bracing goes only in solid walls: the west gable, the walls on lines 3 and 4, and the office's north wall. The roof deck carries the load across the glass bay. The walls and roof are insulated sandwich panels on this frame, drawn in the Structure part.

  2. 10

    Move the solar panels off the roof onto a deck canopy

    As you asked, the array comes off the roof (replacing memo item 6's roof array) and becomes the roof of a 3.6 m deep deck along the whole south front. Twelve modules (7.74 kWp) sit in one row on a steel canopy tilted 10°, with posts on grid lines 1–5. That gives about 9,800 kWh a year, a little more than the roof's 9,300, thanks to the 12th module. The canopy also does the job of Rev.0's eave: at noon it keeps the sun off the south glass from late January to late November, so no exterior screen is needed.

    The cost is winter sun. At the December solstice the noon sun now reaches only about 0.3 m into the rooms instead of 3.4 m, which adds very roughly 500 kWh a year of heat-pump electricity. Use glass-glass modules rated for overhead use, have the structural engineer design the canopy for typhoon uplift, and ask the 건축사 how it counts: with open sides it shouldn't add floor area, but it will probably count toward building area (건축면적).

Also

Smaller fixes

  • Toilet boothsRev.0's booths are about 0.8 m wide inside. Thin cubicle partitions give 0.9 m each in the same 2.0 m. One larger all-gender room is still an option, and Rev.0 already asks you to choose.
  • West elevationA-201 shows only the south, north and east sides. Add the west. After change 2 it is a plain brick gable.
  • Air unitsA combined air purifier and dehumidifier (제습 공기청정기) and a winter humidifier stand against the office's east wall, and a dehumidifier stands in storage, pumping its water to the mech-room floor drain. The hub switches them by relay from the room sensors (rules 1, 2, 25 and 26). Choose models that restart by themselves after a power cut.
  • Canopy modulesUse glass-glass (bifacial) modules rated for overhead installation. They're safer over people than framed modules with a plastic backsheet, the gaps between them let some daylight through, and the back face picks up light reflected off the deck.
  • Office to deckThe deck now runs along the whole front. Add a glazed door in the office's south-east corner, where the wall is solid between 6.2 and 7.0 m, for a second exit and a direct way out to the deck.
  • Permit routeIn 관리지역 or 농림지역, 건축신고 covers buildings under 200 ㎡ (건축법 제14조 ①-2), so 99.40 ㎡ is only a hard limit in 도시지역. Check this once the 지번 is known.

Decisions

Your call

  1. Heat pump or electric boiler? This decides changes 7 and 8 and the boiler line in the E-102 budget.
  2. Which side does the road come from? Rev.1 still assumes a north entrance. Send the 지번 and the plan can be fitted to the lot.
  3. Two toilet booths, or one larger room?
  4. Storage door: a 1.6 m pair, or a 2.4 m overhead door for pallets?
  5. Is there a public sewer at the lot? If not, M-101 puts the septic tank at the north-east corner, near the road for the pump-out truck.
  6. Monitoring: Pico nodes plus the Raspberry Pi hub for the web app, as drawn in C-001, or Picos alone? Picos alone can show a page on the office Wi-Fi, but can't safely open the door from outside the office.
  7. Battery: keep 16 kWh indoors as drawn, or go to 32 kWh in an outdoor cabinet? The battery research explains why 32 kWh can't go in the mech room.
A

건축 도면 · Architecture

Elevations, section, roof and view

The outside of the building in Rev.1, with the solar deck along the south front. The floor plan, A-101, is in the review above.

A-201입면도 · Rev.1 elevations
남측 입면 South마당 쪽 · 태양광 데크 캐노피 645 W × 12 · 10°+4,594+3,000+2,390FL ±0AC · HP 실외기북측 입면 North주출입 · 실외기 · 지붕에 태양광 없음+4,594+3,000FL ±0동측 입면 East적벽돌 박공 · 창고 1,600 · 기계실 900 · 계량기서측 입면 West적벽돌 박공 · 창 없음 (변경 2)

Rev.0's A-201 shows the panels on the roof and leaves out the west side. In Rev.1 the roof is plain standing seam, the solar canopy runs along the south front over the deck, and the west gable is solid brick (change 2). The east gable carries the meter, the louvres and motion-sensing lights over both service doors. Window heights are assumed (south sill 900, head 2,400; north high window sill 1,600) until a window schedule is drawn.

A-301단면도 A-A · Rev.1 · looking west through the glass bay
PV 캐노피 10° · 645 W × 12ERV급기 supply6/21 78.8°9/22 55.4°12/22 32.0°0.17 m회의실 Meeting경사 노출천장 3,000 → 4,274로비 Lobbyservice bridge덕트·배관·데이터태양광 데크 Solar deck남 South · 마당북 North · 주출입최고 +4,594처마 +3,000로비 천장 +2,400FL ±0GL −3005610

The lobby's flat ceiling hides the services crossing (5) and holds the meeting room's supply grille (6). Sun angles are for Goheung, 34.6° N, at noon, drawn through the outer edge of the solar canopy (10). From late January to late November the noon sun doesn't reach the south glass. At the December solstice it lights only the bottom 0.17 m and reaches about 0.3 m into the room. The canopy's outer edge is about 2.4 m above the deck.

A-401지붕 평면도 · 태양광 데크 캐노피 · Rev.1
북측 경사 20°남측 경사 20° · 패널 없음10°용마루 FL +4,594PV 645 W × 12 = 7.74 kWp · 유리-유리 양면형기둥 · 격자선 1–5 · RD 끝 기둥 2곳15,400 지붕14,300 캐노피9007,0009002,5603,600N

The roof keeps its standing-seam finish with no panels and no fixings through it. The array moves to the canopy over the south deck: the same 645 W modules as Rev.0, plus one more, in a single row tilted 10° to the south. The flatter tilt loses a few percent a year, and the 12th module more than makes it up. The gaps between modules let some light and rain through. The rest of the rain runs off the low edge into a gutter and down the two end posts (M-101). The panels can be rinsed from the deck with a soft brush.

태양광 사양Rev.1
모듈645 W급 단결정, 2,382×1,134, 유리-유리 양면형
수량 · 용량12장 · 1열 세로 · 7.74 kWp
배열14,300 × 2,382 (평면 깊이 2,560)
방위 · 경사정남 · 10° (캐노피)
구조철골 캐노피, 기둥 격자선 1–5, 높은 쪽은 처마 골조에 지지
인버터하이브리드 8–10 kW · 기계실 (E-301)
예상 발전량연 약 9,800 kWh
A-501외관 (남동측 조감) · Rev.1
징크 스탠딩심 박공지붕지붕에는 태양광 없음태양광 데크 캐노피645 W × 12 = 7.74 kWp · 10°유리 회의실 (가운데 통로)캐노피 아래로 보이는 유리치장벽돌 박공벽창고 출입 (자재 반입)사무실 · 흑회색 금속패널데크 3.6 m · 남측 전면

The same view as Rev.0's A-501, from the south-east, drawn a little lower so the façade shows under the canopy. The roof is plain grey standing seam. The solar canopy runs the length of the south front over a 3.6 m deck, on five slim posts, and the dark office wall and the meeting room's glass show beneath it. The east brick gable keeps the storage and mech-room doors.

S

구조 · Structure

Steel frame and insulated panels

The walls and roof are insulated sandwich panels, the cold-store kind (냉동 판넬), on a light steel frame: five portal frames on grid lines 1–5, purlins across the roof and girts along the walls. The solar canopy has its own steelwork off the south columns. Member sizes are starting values for the structural engineer.

S-101골조 평면 · Steel frame plan
12345ABCC1 기둥R1 보P1 중도리ES 처마도리BR 지붕 가새벽 가새CO 외팔 받침CB 캐노피 보CR 서까래레일CP 캐노피 기둥유리 회의공간기둥 없음 · 중도리 경간 3.8 m3,5503,5503,8003,3007,0003,4206,480 골조 경간N

Five portal frames on grid lines 1–5 carry the roof. Each column stands 260 mm inside the panel line, so the panels can wrap the frame in one piece. The glass bay has no columns: purlins span the 3.8 m between frames 3 and 4, and the curtain walls carry no roof load. The roof is braced in the two end bays, and the walls only where they are solid (change 9). The canopy hangs off the south columns on short outriggers, and its outer edge stands on five posts on grid line C.

부재 일람 · Members (starting sizes)
기호부재규격
C1기둥 Column ×10H-200×100×5.5×8
R1보 Rafter ×5, 헌치H-200×100×5.5×8
P1중도리 Purlin @1,170C-125×50×20×2.3
G1띠장 Girt @1,500C-100×50×20×2.3
ES처마도리 Eave strutC-150×65×20×2.3
BR가새 Bracing환봉 Ø12–16, X
BP베이스 플레이트PL-250×250×16, M20 ×4
CO외팔 받침 OutriggerH-150×75, 열교 차단 패드
CB · CR캐노피 보 · 서까래H-150×75
CP캐노피 기둥 ×5□-100×100×4.5
S-201골조 단면 · Typical frame, grid 2, looking east
지붕 판넬 150준불연 심재 · 스탠딩심 외관중도리 P1 · C-125@ 약 1,170보 R1 · H-200×100처마·용마루 헌치기둥 C1 · H-200×100판넬 안쪽, 격자에서 260띠장 G1 · C-100@ 약 1,500외벽 판넬 125중심선 = 격자선 A·B실내 석고보드 2겹판넬 이음 기밀 처리베이스 플레이트 · M20 앵커독립기초 위모듈 645 W유리-유리 양면형레일 · C-100캐노피 서까래 CRH-150×75 · 10°캐노피 높은 보 CB외팔 받침 CO기둥에서 · 열교 차단 패드캐노피 기둥 CP□-100×100 · 독립기초최고 +4,594사무실 · 반자 2,700데크남 South북 North6,480 기둥 중심

A typical frame on grid 2, through the office. The wall panel's centreline sits on the grid line, with the girts and the column inside it. Measured to the wall centreline, the floor area stays 99.40 ㎡. The panels wrap the outside of the frame in one continuous layer, so the steel stays warm and dry inside it. Only the canopy outriggers pass through the wall, on thermal-break pads. At the posts there is about 2.25 m of headroom under the canopy beam.

S-301판넬 상세 · Panel details, about 1:10
① 벽체 하부 · 판넬 받침외벽 판넬 125 · 준불연 심재베이스 앵글 L-75 · 앵커물끊기 후레싱슬래브 둘레 단열 XPS 100바닥 (A-602)기초보 · 슬래브② 처마 · 벽과 지붕 판넬지붕 판넬 150중도리 C-125처마도리 C-150외벽 판넬 125밀폐 후레싱매립 물받이처마 반자③ 판넬 이음 · 평면실외실내숨은 피스 · 은폐 체결띠장 C-100기둥 H-200석고보드 2겹숫·암 이음 + 실링

① The wall panel stands on a steel angle at the slab edge, clear of the ground, with a drip flashing over the slab-edge insulation. ② The roof panel runs over the top of the wall panel onto the eave purlin. A flashing closes the gap, and the gutter sits inside the eave. ③ Wall panels lock together with a tongue and groove. The screw is hidden in the joint and goes into the girt, and the joint is sealed on the inside to keep the building airtight for the ERV.

판넬사양 (계획)
외벽125 mm, 준불연 심재 (PIR 또는 그라스울), 0.5 mm 컬러강판 양면, 1,000 폭 세로, 은폐 체결
지붕150 mm, 같은 심재, 스탠딩심 외관, 중도리에 클립 고정
박공 (동·서)판넬 앞에 치장벽돌, 공기층과 연결철물, 기초 받침
유리 회의공간커튼월, 지붕 하중 없음
기초기둥·캐노피 기둥 독립기초, 기초보, 슬래브 둘레 XPS 100
M·E·L

설비 · Services

Water, heating, power and lighting

Three sheets drawn over the Rev.1 plan. Pipes and cables cross the building on one route, through the toilet and lobby ceilings into the office ceiling. The water and refrigerant pipes run along one side and the cable tray about 400 mm away on the other.

Change 7

Heating: electric boiler or heat pump

Both heat the same floor loops with water at 30–35 °C. Heat pumps work best at low water temperatures like these.

Electric boiler (Rev.0)Air-to-water heat pump (Rev.1)
Power draw at the coldest hour6–9 kW (typical boiler size for this floor)about 2 kW
On the hybrid inverter and 16 kWh batteryTakes most or all of the inverter by itself, so in practice the heating runs off the gridFits, with room left for the AC and office loads
Electricity on a cold January dayabout 30 kWhabout 10 kWh
Solar output on an average January dayabout 18 kWhabout 18 kWh
Heating electricity per yearabout 4,000 kWhabout 1,300 kWh
Share of the canopy's 9,800 kWh a yearabout 41 %about 13 %
In the mech roomBoiler and tankSmall indoor module and tank. The fan unit sits outside next to the AC unit
Purchase priceLowerHigher. Get quotes for both

Rough figures for comparing the two options, not for sizing equipment. Assumes a heat loss of about 170 W/K for the Rev.0 envelope (외단열, low-E double glazing, ERV), a design low of −6 °C, a January mean of about 2 °C, heating on workdays with a night setback, a seasonal heat-pump COP of about 3, and solar yield scaled from A-401 (3.6 h/day over the year, about 2.6 h/day in January) to 12 modules at 10°. The canopy's loss of winter sun adds very roughly 500 kWh a year to either option.

M-101급수·배수 · Water and drainage
태양광 데크 Solar deck문서 수납복합기·플로터탕비대표석청정제습가습2인 테이블사무실신발장신발장현관 타일 · shoes off로비회의실AC세면WCWCHP 실내기분배기제어함분전반버퍼배터리인버터ERV기계·전기실창고제습AC 실외기HP 실외기AC주출입 EntranceN0125mRDRDRDRDRDRDICICST 정화조공공하수도 없을 때FDFD제습기 배수M수도 인입 Ø20WMMVEWHEWHBFHB 외부 수전 · 마당급수 Ø20 · 천장 속AC 응축수탕비 배수 Ø50 · 옥외 매설 1/50오수 Ø100

Cold water comes in from the road through a meter to a main valve under the toilet basin. From there it rises into the ceiling and runs to the WCs, the pantry, the heating fill and the yard tap. Each sink has its own 15 L heater, so no hot-water pipe crosses the building. Drains run under the slab inside and are buried outside, to an inspection chamber and then the public sewer, or a septic tank if there isn't one. Rainwater goes to separate catch pits.

  • 급수 Cold water
  • 급탕 Hot water, from an EWH 15 L heater under each sink
  • 오수 Ø100 from the WCs
  • 배수 Ø50 from the basin, sink and floor drains
  • AC condensate
  • RD downpipe to a catch pit, kept apart from the sewer

WM meter · MV main valve and pressure reducer · BF backflow preventer · FD floor drain · IC inspection chamber · ST septic tank · HB frost-free yard tap

기구 Fixture급수급탕배수
수도 인입 SupplyØ20––
세면대 BasinØ15Ø15Ø50
대변기 WC ×2Ø15–Ø100
바닥배수 FD ×2––Ø50
탕비 싱크 PantryØ15Ø15Ø50
난방 보충수 Heating fillØ15––
외부 수전 Yard tapØ15––
AC 응축수 ×2––Ø25
선홈통 RD ×4––Ø100
E-301단선결선도 · Single-line diagram
PV 데크 캐노피645 W × 12 · 7.74 kWpDC 차단기 · SPD하이브리드 인버터8–10 kW · 계통 통과 ≥ 50 A배터리 16 kWh51.2 V · BMSPV 케이블 6 ㎟≈ 12 m · 지중 관로35–50 ㎟2 m 이내한전단상 220 V전력량계양방향주차단기2P 50 A · SPDCT → 허브바이패스 S/W정비 때 한전 직결GRID IN16 ㎟LOAD OUT16 ㎟바이패스 (평소 열림)분전반 하나 · 건물 전체C1C2C3C4C5C6C7C8C9C10C11C12C13C14C15C16예비정전 때도 계속: C1–C8 · C15 · C16정전 때 허브가 끊음: C9–C14 (AC · 히트펌프 · 온수기 · 탕비 · 복합기)운전 · 한 줄 (one power line)평소: 한전 → 인버터 → 분전반. 태양광을 먼저 쓰고,남으면 배터리 충전, 그다음 한전으로 역송밤: 배터리 → 분전반, 모자라면 한전이 인버터를 거쳐정전: 인버터가 한전을 끊고 건물 전체를 계속 공급(큰 부하를 끊은 약 2.3 kW로 16 kWh면 약 6시간)인버터 정비: 바이패스 S/W로 한전 직결

One power line. Mains comes through the meter and main breaker into the hybrid inverter, and the inverter feeds one panel for the whole building. The canopy array and the battery join at the inverter. In a power cut the inverter disconnects from the grid (anti-islanding) and keeps the whole building live; the hub cuts C9–C14 so the load stays within the inverter's rating. The bypass switch feeds the panel straight from the grid while the inverter is out for service. Choose an inverter whose grid pass-through is at least the 50 A main breaker, or a bigger inverter is needed.

What the services layout settles

  • Wet side, dry sideIn the mech room the heat pump, manifold, buffer tank and floor drain sit on the west side. The panel, inverter and battery are on the east side, so no pipe runs above the electrics.
  • Panel by the meterThe meter goes on the east gable beside the mech-room door, readable from outside. Rev.1 swaps the panel and the control box, and the battery and the inverter, so meter, panel and inverter line up along the east wall with short cables. The inverter, which runs warmer than the battery, now sits by the louvers.
  • Hot water at the sinkA 15 L heater under each sink, not a hot-water pipe from the mech room. The pantry is 7 m away; a long pipe would run cold for a minute every time and leave warm water standing in it.
  • Pantry drainGoes out through the north wall and along the outside to the inspection chamber, instead of under the heated glass-bay floor. One bend, with a cleanout chamber on it.
  • Meeting-room ACE-101 puts the wall unit on the west wall, where its pipes would have to cross the exposed sloped ceiling. Rev.1 puts it on the east wall, backing onto the mech room, so its pipes and drain go straight through the wall.
  • Floor boxesFour of them, under the director's desk, the desk island and the meeting table. Set them out and lay their conduits before the heating pipes go down.
  • One power lineMains, solar and battery meet in the hybrid inverter, which feeds the one panel. Nothing is split into backed-up and non-backed-up sections: the hub decides what to switch off in a power cut, through a contactor on each heavy circuit.
  • Solar cablesThe DC cables run down the canopy's east post and through an underground duct to the inverter, about 12 m. Nothing pierces the roof.
  • Wet and outdoorToilet, storage and outdoor sockets are on 15 mA RCDs (누전차단기) with waterproof covers. The yard tap is frost-free. An EV charger isn't drawn; it would need a 6 ㎟ circuit and a conduit to the parking space once the site plan exists.
C

모니터링 · Monitoring

Running the office from a phone

Six Pico boards around the building read the sensors and switch things on and off: lights, heating and cooling, the battery and inverter, the air units, the door and the water. Temperature probes watch the heating, the battery and the panels, humidity is measured in every room, and a rain gauge sits on the canopy. I've assumed the Raspberry Pi Pico 2 W. The Raspberry Pi hub already planned in E-102 sits in the middle. It runs the web app, keeps the history and applies the rules. The Picos only take orders from the hub, and your phone talks to the hub, never straight to a Pico.

C-001모니터링 계통도 · System diagram
직원 휴대폰웹앱 (홈 화면에 추가)로그인 · 패스키외부에서VPN (WireGuard · Tailscale)포트 개방 없음공유기 · 방화벽사무용 Wi-FiIoT VLAN (Pico 전용)HTTPS허브 · Raspberry Pi 5웹앱 (HTTPS · 사용자별 권한)MQTT 브로커 (TLS)기록 DB · 그래프자동 규칙 1–28제어함 · 분전반 C6 (배터리)DALI-2 게이트웨이실내 조명 디밍 (조명 조사)NVR로비 카메라 · 출입 때 스냅샷N1 출입 · 로비전기 스트라이크 · 도어 접점 · 퇴실 버튼키패드/카드 · 로비 재실 · 온습도유선 PoEN2 사무실온습도·CO₂·PM2.5·VOC · 재실 2 · 주광바닥온도 · 탕비 누수 · 청정제습기·가습기Wi-FiN3 회의실온습도·CO₂ · 재실 · 바닥온도데크 슬라이딩 도어 접점Wi-FiN4 전력 · 기계실RS485 Modbus: 인버터·배터리 · 전력량계 · AC·HP·ERV차단 접촉기 C9–C14 · 화재감지 접점 · 환기팬기계실 온습도 · 배터리 온도 프로브유선 PoEN5 급수 · 난방 · 창고누수 3 · 전동 메인밸브 · 수도 계량 펄스 · 동파 프로브온도 프로브: 난방 공급·환수 · 버퍼탱크화장실 습도·환기팬 · 창고 온습도·제습기 · 창고문Wi-FiN6 데크 · 외부강우 감지 (캐노피 위 우량계) · 외기 온습도패널 온도 프로브 · 외부 조명 릴레이사무실 데크 문 (추가 시)Wi-Fi · IP65Pico 2 W (Wi-Fi) · W5500-EVB-Pico (유선 PoE) · MQTT로 허브와 통신

Why there's a hub in the middle: a Pico 2 W can serve a simple page on the office Wi-Fi, but it doesn't have the memory for a secure, logged-in web app that's reachable from outside, and a door lock shouldn't be on the open internet. So the hub handles the web app, logins, history and rules, and the Picos handle the wiring. The door node (N1) and the power node (N4) are wired, so they keep working if the Wi-Fi drops. Everything runs off the battery-backed panel (C6), so it all stays up in a power cut.

C-101센서·제어 배치도 · Device plan
태양광 데크 Solar deck문서 수납복합기·플로터탕비대표석청정제습가습2인 테이블사무실신발장신발장현관 타일 · shoes off로비회의실AC세면WCWCHP 실내기분배기제어함분전반버퍼배터리인버터ERV기계·전기실창고제습AC 실외기HP 실외기AC주출입 EntranceN0125m허브 PiN1N2N3N4N5N6STDCEXKPPSTHCAMAQPSPSDSFTWLRRAQPSFTDCMBKMSDTHDCFNTPWLWLWLMVWMFZTPTPTPTHFNTHRDCPSTHRDCRNTPN6 방수함 · 캐노피 아래

Where each node, sensor and switched device goes on the Rev.1 plan. This replaces the sensor layout in E-101. Room sensors go 1.2–1.5 m up on inside walls, away from windows, the AC and the air units, so they read the room and not the machine next to them. Solid lines are wired links, dotted lines are Wi-Fi, and thin lines show which node each device wires back to.

  • Pico node N1–N6 · hub
  • Sensor: TH temp/humidity · AQ CO₂/PM/VOC/humidity · PS presence · DS daylight · DC door contact · KP keypad · EX exit button · WM water meter
  • Switched: ST door strike · MV main valve · R relay (air units, outdoor lights) · KM shed contactors · FN fans (louvre, toilet extract)
  • Temperature probe: TP heating flow and return, buffer tank, battery, canopy panel · FT floor · FZ storage pipe
  • RN rain gauge on top of the canopy
  • Safety: WL water leak · SD fire detector contact (certified, read only)
  • MB Modbus link to the inverter, battery data and meter
NodeWhereLink
N1Entrance and lobby: strike, door contact, exit button, keypad, presence, THWired PoE
N2Office: AQ, presence ×2, daylight, floor temp, pantry leak, air-unit relaysWi-Fi
N3Meeting room: AQ, presence, floor temp, deck doorWi-Fi
N4Control box: Modbus to the inverter, meter, AC, HP, ERV; shed contactors; fire contact; room temp and humidity; battery probe; fanWired PoE
N5Mech room wall: leaks ×3, main valve, water meter; probes on the heating flow, return and buffer tank and the storage pipe; toilet humidity, extract fan and presence; storage TH and dehumidifierWi-Fi
N6Deck, under the canopy: rain gauge, panel probe, outside TH, outdoor lights, office deck doorWi-Fi, IP65 box

What it watches and switches

항목How the Pico gets itWhat it can switchAlerts
조명 LightsDALI-2 gateway indoors, N6 relays outside, presence and daylight sensorsOn, off, dimming, scenes, outdoor scheduleLamp or driver fault
온도 TemperatureTH and AQ sensors in every room and outsideAC and heat-pump set points (Modbus via N4)Room out of range
온도 프로브 ProbesWaterproof DS18B20 probes: heating flow and return at the manifold, buffer tank, battery case, one canopy panel, two floors, the storage pipeHeat-pump flow temperature, battery charge currentFlow over 40 °C, tank not heating, battery or panels hot, floor over 27 °C, pipe near freezing
배터리 BatteryBMS data read from the inverter over Modbus (N4)Charge window, when to heat the buffer tankBelow 20 %, hot, BMS alarm
인버터 InverterModbus (N4): solar, grid, load, fault codesWork mode; tells the hub when the grid is lostFault, power cut, low output on a clear day
습도 HumidityEvery room's TH or AQ sensor, plus the toilet, storage, mech room and outsideHumidifier, dehumidifiers and the toilet extract fan through relays (N2, N5)Room over 60 % or under 40 % for an hour, tank full, mech room outside the battery's range
공기청정 Air filterPM2.5, VOC and CO₂ (AQ), run hoursPurifier speed, ERV boostFilter due, PM2.5 high
출입 EntryDoor contact, who unlocked (app, card, keypad), presence, cameraDoor strike (N1)Door held open, entry in security mode
누수 WaterLeak sensors, meter pulses (N5)Motorised main valveLeak, water running at night
기계실 Mech roomRoom temp, fire detector contact (N4)Louvre fanOver 35 °C, detector
강우 RainTipping-bucket rain gauge on top of the canopy (N6), with outside humidityStarts the storage dehumidifier earlyRain with a deck door open, heavy rain (check the gutters), a long dry spell with dirty panels
동파 FreezeProbe on the storage pipe, outside temp—Pipe below 3 °C
전력 PowerEnergy meter with CTs on every circuitShed contactors C9–C14Unusual night load
시스템 SystemNode heartbeats, internet—Node silent for 5 minutes

The web app

고흥사무소정상
근무 중 · 5명08:52 첫 출입 · 직원 A · 카드
배터리78%충전 +1.2 kW
태양광4.6 kW오늘 18.4 kWh
사무실23.4°52% · CO₂ 640
회의실22.8°비어 있음
비 감지 · 시간당 2 mm · 데크 문 닫힘
ERV 필터 교체까지 120시간

A clickable mockup with sample values. Try holding 열기 on the 출입 tab.

Opening the door from a phone

  1. On the 출입 tab, hold the button for a second. Having to hold it stops a phone opening the door from inside a pocket.
  2. The phone sends the request over HTTPS to the hub. It goes directly on the office Wi-Fi, or through the VPN from anywhere else.
  3. The hub checks the person's account, door permission and time window (E-102), then tells N1 over MQTT to release the strike for 5 seconds.
  4. N1's door contact confirms that the door opened and shut again. The hub logs who opened it and when, saves a camera snapshot and updates the app.
  • No open portsReach the office from outside only through a VPN (WireGuard or Tailscale). Never forward a router port to the hub or to a Pico.
  • One account eachEach person signs in with a passkey, and nobody shares a PIN. Delete an account and that person's access ends on every phone.
  • Works offlineThe keypad and card reader work through N1 even when the hub or the internet is down, and a mechanical key overrides everything.
  • Never locked inUse a fail-secure strike, which stays locked without power, on the battery-backed panel. The inside lever always opens the door. Ask the fire designer whether the door has to release on a fire alarm.
  • Knowing who's inDoor contact + who unlocked + presence sensors tell the hub when someone arrives and who it was. An entry with no unlock during security mode sounds an alarm.

Ground rules for the system

  • Safety stays separateFire detection, the battery emergency stop (KEC 512.1.4), emergency lights and exit signs are certified stand-alone devices. The Picos only read their outputs and send alerts. They never control them.
  • Fail safeIf a node stops, the shed contactors leave their circuits on, the DALI lights hold a fixed level, the main valve stays where it is, and the door stays locked but opens from inside.
  • Low voltage onlyThe Picos switch only low-voltage relay coils. Mains contactors and relays sit in the panel and are wired by the electrician.
  • Own networkThe Picos run on their own VLAN. MQTT uses a password per node and TLS, and firmware is updated only from inside the office network.
  • CameraThe camera covers the entrance only. Put up notice signs and get staff consent (개인정보보호법, E-102).

Rules 17–32, added to E-102's rules 1–9 and the lighting note's 10–16

#WhenThe hub does
17The inverter reports a power cutOpens the shed contactors on C9–C14 and sends an alert. Five minutes after power returns, it brings them back one at a time.
18Any leak sensor gets wetCloses the motorised main valve and alerts everyone. Someone reopens it by hand in the app.
19Water runs for 30 minutes at night or at a weekendAlerts: probably a running WC or a leak
20Mech room over 35 °CLouvre fan on. Over 40 °C: alert, and lower the battery charge current.
21Fire detector in the mech room tripsAlerts everyone and shows which doors are open. The certified detector and the emergency stop act on their own.
22Door open for more than 2 minutesAlert
23Door opens in security mode without a valid unlockAlarm, camera snapshot, alert
24Someone opens the door from the appChecks the user and time window, releases the strike for 5 s, confirms with the door contact, logs it
25Storage humidity over 60 %Storage dehumidifier on; off again at 50 %
26Office PM2.5 over 25 µg/m³Purifier to high. If outside PM is high too, cut the ERV's outdoor air.
27Floor surface over 27 °CLowers the heat pump's flow temperature (flooring note)
28A node goes silent for 5 minutesAlert. That node's outputs go to their fail-safe state.
29Rain starts while the deck slider or the office deck door is openAlert on phones and the wall panel
30Toilet humidity over 70 %Extract fan on until it drops below 60 %, running at least 10 minutes
31Heating flow over 40 °C, or the buffer tank not warming for 30 minutes in heating hoursAlert and lower the heat-pump set point (see rule 27)
32No rain for 30 days and clear-day solar output down 10 %Reminder to rinse the canopy panels from the deck

Parts list

PartQtyFor
Raspberry Pi Pico 2 W4N2, N3, N5, N6 on Wi-Fi
WIZnet W5500-EVB-Pico with a PoE splitter2N1 and N4, wired
Raspberry Pi 5 with an SSD (the E-102 hub)1Web app, MQTT, history, rules
Sensirion SCD41 (CO₂ + temp/humidity) · SGP41 (VOC)2 · 2Office, meeting room
PM2.5 sensor (SPS30 or PMSA003I)1Office
SHT45 temp/humidity6Lobby, toilet, mech room, storage, outside, spare
mmWave presence sensor (LD2410 class)7Office ×2, meeting, lobby, toilet ×3
Reed door contacts · light sensor (BH1750 class)5 · 1Outside doors · daylight
Water leak sensors4Pantry, basin, WCs, mech room
Waterproof DS18B20 temperature probes8Heating flow and return, buffer tank, battery, canopy panel, floors ×2, storage pipe
Tipping-bucket rain gauge (reed output) · anemometer, optional1 · 0–1On top of the canopy, east end · typhoon wind alerts
12 V fail-secure electric strike, exit button, keypad/card reader1 setMain door
Motorised ball valve 20A · pulse water meter1 · 1Main supply (replaces MV)
RS485 transceiver (MAX3485) · Modbus energy meter with CTs1 · 1N4 · every circuit
AC, heat-pump and ERV interfaces (Modbus or contacts)3From each maker
2P contactors, wired to fail on · opto-isolated relay modules6 · ~7C9–C14 · air units, fans, outdoor lights
DALI-2 gateway · 12 V DC supply1 · 1Indoor lights · strike, valve, nodes
조사

조사 · Research

Lighting, battery and flooring notes

Three notes from the project folder, dated 2026-10-27, included in full. Each opens with how it fits Rev.1.

Research · 조명 Lighting

LED lighting plan: Goheung office (inside and outside)

고흥사무소_조명_조사.md · Research date: 2026-10-27 · Goes with: 고흥사무소_계획안.pdf (Rev.0), sheets A-101, A-301, A-602, E-101, E-102 · Related: 고흥사무소_바닥재_조사.md, 고흥사무소_배터리_조사.md

The brief

Choose LED lighting for every room, and decide where each light goes, including outside the building.

조명LED 조명 배치도 · Lighting layout
LED lighting layout on the Rev.0 plan: office panels, meeting-room pendant, lobby and toilet downlights, service-room battens and shielded exterior lights

고흥사무소_조명_배치도.svg, drawn on the Rev.0 plan. Positions in metres from the south-west corner, ±0.3 m.

The drawing above is 고흥사무소_조명_배치도.svg. Positions are measured in metres from the building's south-west corner, on wall centrelines, and are accurate to about ±0.3 m at this stage.

The plan in short

Where Lighting
Office 9 recessed linear LED panels in 3 rows, 4000 K, low glare (UGR < 19), about 500 lx on the desks. The row nearest the windows dims itself when there is daylight.
Meeting room One long suspended pendant over the table that lights both down and up, plus a hidden LED strip on top of the furniture wall washing light up into the sloped wood ceiling. 3000–4000 K, high colour rendering (Ra ≥ 90) so faces look right on video calls.
Lobby Warm 3000 K downlights: two over the shoes-off entry strip and one in the middle, plus a soft strip under the shoe cabinet. They turn on when someone walks in.
Toilets Warm downlights and a mirror light, all rated for damp rooms (IP44), with presence sensors that won't switch off on someone sitting still
Boiler/electrical room, storage Sealed IP65 LED battens, plus a battery-backed emergency light in the electrical room
Outside A few warm (2700 K), fully shielded lights: at the front door, the deck, the two east service doors and along the path. No floodlights. Most go to motion-only after hours. The site sits among rice paddies, and night light measurably cuts rice yields.
Controls Everything runs through the planned control hub: presence, daylight, a security mode after the last person leaves, and sunset/sunrise timing for the outside lights

Light levels

I used the European standard EN 12464-1 for the targets, because it is widely used, including by the free DIALux lighting calculations that suppliers run. The Korean standard is KS A 3011 (조도 기준, last confirmed 2023), but I couldn't get its tables. Ask the supplier to check the final design against KS A 3011.

Space Target light level (on the task) Colour temperature Glare limit (UGR) Colour rendering (Ra)
Office desks 500 lx (about 300 lx around them) 4000 K < 19 ≥ 80, 90 better
Meeting table 500 lx 3000–4000 K < 19 ≥ 90 (video calls)
Lobby / entrance 100–200 lx 3000 K < 22 ≥ 80
Toilets 200 lx, plus light on faces at the mirror 3000 K < 25 ≥ 90 at the mirror
Boiler/electrical room 200 lx 4000 K < 25 ≥ 80
Storage 100–200 lx 4000 K < 25 ≥ 60
Outside: front door about 50 lx 2700 K No light above horizontal ≥ 70
Outside: path, deck about 5–20 lx 2700 K No light above horizontal ≥ 70
Edge of any rice field 2 lx or less — — —

The outdoor figures are design targets I chose, not taken from a standard. The rice-field limit comes from the crop research below.

Office check: 9 panels at about 4,500 lm plus 2 downlights at about 1,000 lm gives about 42,500 lm over about 47 m² of floor. After typical losses from room surfaces and dirt over time, that averages roughly 450–500 lx, and more over the desks, which have panels directly above them.

Interior fixtures

ID Where Fixture Qty Specification
L1 Office Recessed linear LED panel, 1200×300. Korean ceilings are often built for 1280×320 panels instead, so match the ceiling grid. 9 40–45 W, about 4,500 lm (≥ 110 lm/W), 4000 K, Ra ≥ 80 (90 better), UGR < 19 (prismatic diffuser), flicker-free driver, DALI-2 dimmable
L2 Office, in front of the document cabinets Recessed downlight, Ø100–150 2 10–12 W, about 1,000 lm, 4000 K, angled toward the cabinet fronts. This corner gets downlights, not a panel, because the ventilation unit (ERV) sits in the ceiling above it.
L3 Office pantry (탕비) LED strip in an aluminium profile, under the wall cabinets 1 run, about 1.5 m 4000 K, Ra ≥ 90, its own switch at the counter
L4 Office reception corner (응접), optional Decorative pendant over the low table 1 3000 K, about 800 lm, dimmable. Gives the corner a warmer feel.
M1 Meeting room Suspended linear pendant lighting both down and up, about 2.2 m long, running north–south along the table 1 About 5,000–6,000 lm, about 60% down and 40% up, 3000–4000 K (tunable or fixed 3500 K), Ra ≥ 90, UGR < 19, DALI-2
M2 Meeting room, on top of the 2,100 mm furniture wall LED strip pointing up 1 run, about 2.7 m 3000 K, 4–6 W/m, dimmable
B1 Lobby Surface cylinder downlight fixed between the wood louvres 3 8–10 W, about 750 lm, 3000 K, Ra ≥ 90, deep anti-glare
B2 Lobby, under the shoe cabinet LED strip at floor level 1 run, about 1 m 3000 K, low output, turned on by motion
T1 Toilets: wash area and 2 cubicles Downlight, IP44 3 About 8 W, 3000 K
T2 Toilets, over the washbasin Mirror light, IP44 1 3000–4000 K, Ra ≥ 90, lights faces from the front
S1 Boiler/electrical room (2), storage (2) Sealed LED batten 1200 mm, IP65 4 25–30 W, about 3,000–3,500 lm, 4000 K
EM Boiler/electrical room, by the east door Battery-backed emergency light (비상조명등) 1 At least 1 hour. Lets someone work at the distribution board during a power cut.
EXIT Main entrance, deck door Exit sign (피난구유도등), LED with battery backup 2 Confirm number and positions with the fire-safety designer

Buy from Korean suppliers who show: KS certification (KS 인증) or the high-efficiency equipment certification (고효율에너지기자재 인증); a flicker-free driver (플리커 프리), since staff look at screens all day; and a 5-year warranty. Ask the supplier for a free DIALux calculation using the final ceiling plan.

Positions and the reasons for them

Office (7.1 × 7.0 m, flat 2,700 mm acoustic-tile ceiling)

Group Positions (x, y) in m Why it goes there
Window row: 3 × L1, running east–west (1.3, 2.0), (3.5, 2.0), (5.7, 2.0) Parallel to the 5.2 m south window band, so this row can dim when the sun is in and stay off most bright days. It stays clear of the air-conditioning cassette.
Desk island: 3 × L1, running north–south (3.3, 3.4), (4.7, 3.4), (6.1, 3.4) One panel centred over each pair of facing desks, crossing the partition. Staff face north and south, so running the panels the same way as their line of sight keeps panel reflections off their screens.
CEO desk: 1 × L1, running north–south (1.4, 3.45) Directly over the desk, in front of the person sitting there, not behind them, so it doesn't reflect in their screen
North row: 2 × L1, running east–west (3.4, 5.6), (5.6, 5.6) About 0.7 m in front of the copier, pantry and cabinets, so the cabinet fronts are lit. They stay at least 0.2 m from the Wi-Fi access point and presence sensor in E-101.
L2 × 2 (1.0, 6.0), (2.4, 6.0) Light the document cabinets. The ERV (and its access hatch) takes up the ceiling just south of here.
L3 Under the pantry wall cabinets, x 4.9–6.4 Light on the counter
L4 (1.2, 1.35) Over the reception table
DS daylight sensor (new) (4.6, 2.0) In the window zone, between two window-row panels, looking down at the desks. Add it to E-101.

Coordinate with E-101: the air-conditioning cassette, the ERV, the access point and the sensors all share this ceiling. Draw one reflected ceiling plan before the ceiling contractor sets out the grid.

Meeting room (3.8 × 4.6 m, sloped exposed ceiling from 3,000 to 4,274 mm)

  • M1 is centred over the table at (8.8, 2.0) and runs north–south, with its bottom about 2.1 m above the floor. At that height it stays out of the line of sight to the TV on the north furniture wall.
    • The ceiling slopes from about 3.3 m to about 4.1 m along the table, so the two hanging cables will be about 1.2 m and 2.0 m long, keeping the light level.
    • The upward light brightens the wood louvres, so the room isn't a dark box at night and faces on video calls aren't harshly shadowed.
  • M2 sits on top of the 2,100 mm oak furniture wall and shines up into the slope. It is visible from the lobby through the glass above the wall, so it ties the two spaces together in the evening.
  • Nothing is aimed at the TV.
  • Scenes: Meeting (M1 100%), Video call (M1 80% + M2 50%), Presentation (M1 30% + M2 20%), Off.
  • The room has glass on both the north and south sides, so after dark it glows to the outside and draws insects. The hub switches it off when the room is empty after hours.

Lobby and shoes-off entry (현관)

  • B1: two downlights over the shoes-off strip, either side of the front door at (8.2, 6.2) and (10.0, 6.2), and one in the middle of the lobby at (9.1, 5.25).
  • B2: a strip under the shoe cabinet so people can find their shoes without bright overhead light.
  • The lobby camera needs light on faces: B1 by the door and the outside soffit lights (E1) light faces from the front.
  • The lobby presence sensor already in the plan switches these lights; after hours they come on at a low level.

Toilets

  • T2: light faces from the front at the mirror, not only from above, which casts shadows.
  • T1: one downlight in the wash area at (11.6, 5.6), and one in each cubicle at (13.3, 6.5) and (13.3, 5.5).
  • Use presence sensors (microwave, mmWave or dual-technology) with a 10–15 minute hold. Ordinary PIR motion sensors switch the light off on someone sitting still in a cubicle.

Boiler/electrical room and storage

  • Boiler/electrical room: two IP65 battens running east–west at (11.8, 4.0) and (13.4, 4.0), over the walkway rather than behind equipment. Room lighting is also an electrical-code requirement for battery-storage spaces (KEC 511.1.1; see the battery research).
  • EM: the emergency light, by the east door.
  • Storage: two IP65 battens over the aisle at (11.8, 1.5) and (13.4, 1.5), not above the shelves, so the shelf contents aren't in shadow. IP65 matters because this room has a dehumidifier and damp air. Switch them by a door contact or motion sensor.

Outdoor lighting

Rules for this site

  1. Protect the rice fields. Rice is a short-day plant: it starts forming grain when nights get long, so artificial light at night delays it.
    • Field trial (Rural Development Administration crop research station, 2002): 10–20 lx at night delayed heading (grain formation) by 3–9 days and cut grain yield by 10–21% compared with 2 lx or less.
    • Survey (Rural Development Administration, reported 2011): about 10 m from street lights (6–10 lx), rice yields were down about 16%.
    • What this means here: keep light at any field edge at about 2 lx or less. Use full-cutoff fittings aimed at the building, no poles near field edges, and motion-only after hours from June to October, the growing season.
  2. Use warm light to attract fewer insects. Studies find amber light (about 1800–2200 K) draws significantly fewer insects than 3000–4000 K, and warm white below 2700–3000 K is the usual recommendation. Use 2700 K everywhere outside, or 2200 K amber for anything facing the fields. Shielding and motion sensors cut insect attraction further.
  3. Keep the night sky dark and avoid glare. Use no uplights, no lit brick gables, no floodlights, and keep mounting heights to about 2.4–3 m.
    • Korea's light-pollution law (인공조명에 의한 빛공해 방지법) sets limits only in designated lighting-environment zones (조명환경관리구역, classes 1–4). Class 2 covers areas where too much light harms farming and plant growth.
    • I couldn't confirm whether Goheung has designated zones. Ask the county. Either way, these fittings stay well inside the limits.
  4. The site is coastal. Specify IP65 or better (IP67 for in-deck lights), marine-grade powder coat or 316 stainless steel, and typhoon-proof fixings.
  5. Power during outages: put the outside lights on the battery-backed circuit. They draw only about 120 W in total, so they keep working for security when the grid is down.

Exterior fixtures and positions

ID Where Positions (x, y) in m Fixture Qty
E1 Soffit (underside of the 900 mm eave) over the main entrance, and over the meeting room's deck doors North (8.6, 7.45), (9.6, 7.45); south (8.4, −0.45), (9.8, −0.45) Recessed soffit downlight, IP65, 2700 K, 600–800 lm, recessed deep to cut glare 4
E2 East wall, above the storage double door and the boiler-room door, about 2.4 m up (14.2, 1.25), (14.2, 3.95) Wall downlight with flat glass, so no light goes above horizontal, IP65, 2700 K, about 800 lm, motion sensor 2
E3 Bollards either side of the north approach path, continuing every 4–5 m to the gate (8.1, 9.0), (10.1, 9.0), … Bollard 0.6–0.8 m tall with louvres aimed down, IP65, 2700 K (2200 K if near a field), 200–300 lm 2+ (depends on path length)
E4 Deck front edge (7.9, −1.5), (9.0, −1.5), (10.1, −1.5) Recessed deck marker, IP67, 2700 K, 30–50 lm, so the edge is visible without lighting the yard 3
E5 Yard or parking, optional Once the site plan is known Pole light 3–4 m with full cutoff and a back shield on the field side, 2700 K, brightens on motion. Only if parking needs it; keep it away from the field side. 0–2
— Outdoor battery cabinet, if chosen (battery research option A) At the cabinet One E2-type motion light for access 0–1

Not lit, on purpose: the brick gables, the metal façades, the roof and the solar array. The entrance camera should have built-in infrared night vision, so no light has to stay on all night for it.

Outdoor control

Time What happens
Sunset, using an astronomical clock in the hub for Goheung's sunset and sunrise times (more reliable than a light sensor that gets dirty) E1 entrance and path lights on if anyone is still inside
Last person out (door lock set to security mode, 경비 모드) E1 at 20% or off. E2, E3 and E5 go to motion-only: 100% for 3 minutes, then off.
23:00 to sunrise Everything motion-only
June to October (rice season) Lights facing the fields are motion-only all night, and the deck markers (E4) are off

Controls and the hub (adds to E-102)

Wiring: use DALI-2 for all dimmable indoor fittings. It is a two-wire control cable, cheap to run alongside the power cables during construction. A DALI gateway connects it to the Raspberry Pi hub. Zigbee drivers are a cheaper wireless fallback. Avoid Wi-Fi bulbs. Outside lights can run from simple relays.

Switch groups: - Office: G1 window row, G2 desks and CEO desk, G3 north row plus L2, with L3 and L4 on their own switches - Meeting room: scenes - Lobby and toilets: presence - Service rooms: door contact or motion

Put a scene keypad by each room door. A manual switch must always override the hub.

New hub rules (continuing the numbering in E-102):

# When What
10 Presence in the office Lights on at the work scene. 15 minutes empty: dim to 20%. 30 minutes empty: off. (This matches rule 6.)
11 Daylight The window row dims to keep 500 lx on the desks, and turns off when daylight is enough
12 First entry after dark (door lock) Lobby and office route lights on (pairs with rule 5)
13 Last exit / security mode All inside lights off, outside lights to after-hours mode
14 Sunset / sunrise / 23:00 / rice season Outside schedule as in the table above
15 Running on battery during a power cut Lighting limited to 50% and essential groups only. Emergency light and exit signs run on their own batteries.
16 Toilet presence On. Off after 15 minutes with no one present.

Add to E-101: - 1 daylight sensor in the office window zone - Presence sensors in the toilet wash area and both cubicles - Motion sensors on the E2 east-wall lights and in storage - A DALI gateway in the control box

Power and energy

Load
Inside, everything at 100% About 0.7 kW. The office panels are about 380 W of that, about 8 W/m².
Outside, everything on About 0.12 kW, plus up to about 60 W for optional pole lights
Typical day, with daylight dimming and presence control About 3–4 kWh, a small part of the office's estimated 15–25 kWh per working day (see the battery research)

Still to confirm

  • Site plan: where the rice fields, road, gate and parking are. This fixes the E3 path bollards, E5 poles and which lights count as field-facing.
  • Ceiling grid from the ceiling contractor (1200×300 or 1280×320 panels), and one reflected ceiling plan combining E-101 and this layout
  • Office colour temperature: fixed 4000 K, or tunable white (costs more, DALI DT8 drivers)
  • Fire-safety designer: exit sign positions and any emergency-lighting requirement
  • Goheung county (고흥군): whether a lighting-environment zone (조명환경관리구역) applies at the site
  • Supplier: a DIALux calculation against the targets above and KS A 3011

Sources

Research · 배터리 Battery

Battery bank research: Goheung office (32 kWh LiFePO4)

고흥사무소_배터리_조사.md · Research date: 2026-10-27 · Goes with: 고흥사무소_계획안.pdf (Rev.0), sheets A-101, A-601, E-101, E-102

The brief

Put a bank of LiFePO4 (lithium iron phosphate, LFP) batteries totalling 32 kWh next to the inverter(s), storing power from the 7.10 kWp rooftop solar array.

I have read "32kw" as 32 kWh of stored energy, the same way the plan read the earlier note "16kw" as 16 kWh. (kWh is how much energy the batteries hold; kW is how fast power flows in or out.)

What the plan says now: one 16 kWh battery in the boiler/electrical room (보일러·전기실, 3.3 × 2.0 m = 6.6 m²). The same room holds the electric hot-water boiler, the floor-heating manifold, the heat storage tank, the distribution board, the hybrid inverter and the control box. The budget line is US$1,700 including shipping.

The key finding: 32 kWh crosses Korea's 20 kWh line

Korean rules treat lithium battery storage above 20 kWh as a regulated energy storage facility. A 16 kWh bank is under that line. A 32 kWh bank is over it, and two sets of rules apply:

Up to 20 kWh Over 20 kWh (32 kWh is here)
Electrical code (KEC, 한국전기설비규정) General ESS rules (KEC 511): ventilation, keeping to the maker's temperature and humidity range, protection from flooding and leaks, DC-rated protection Detailed lithium ESS rules (KEC 512.1). Inside a building that visitors use (512.1.6): the battery room must be fire-resistant construction (내화구조); at most 50 kWh per rack; clearances from rack to wall of 1 m at the front and 0.8 m at the sides and back; not on a roof; gas venting; automatic emergency stop within 5 seconds
Fire code (소방시설법 시행령 별표2, NFTC 607) Not a specially regulated fire facility Becomes a regulated fire facility (특정소방대상물, 전기저장시설), whether it sits in a building, a container or an enclosure. Required: fire extinguishers, sprinklers, automatic fire detection, and automatic alarm transmission to 119 (자동화재속보설비). Sprinklers must deliver 12.2 L/min per m² for 30 minutes, and the battery room must be fire-separated (방화구획) from the rest of the building. An outdoor installation may use a battery fire-suppression unit (배터리용 소화장치) instead of sprinklers.
Product certification KC 62619 safety confirmation (안전확인) applies at either size Same

Why 32 kWh will not fit in the planned room

The boiler/electrical room is about 1.8 m deep inside. Under KEC 512.1.6, one battery rack needs 1 m clear in front plus the rack itself (about 0.3 m) plus 0.8 m behind, which is about 2.1 m before anything else goes in. The boiler, heat storage tank and manifold are in the same room. Also, the battery room would need to be fire-separated and have sprinklers, and this rural site may have no water supply that can run them. A sprinkler for this room would need roughly 6.6 m² × 12.2 L/min × 30 min ≈ 2.4 tonnes of water, with a tank and pump.

You can't make a new indoor battery room either. The plan keeps the building at 99.40 m² on purpose: under 100 m², it only needs a building report (건축신고) rather than a full building permit (A-601). An extra room would push it over.

Three ways forward

A. 32 kWh in an outdoor battery cabinet B. 32 kWh in an indoor battery room C. Keep it at 20 kWh or less, indoors
What it is A weatherproof ESS cabinet (옥외형) on a raised base outside the service block. The hybrid inverter stays in the boiler/electrical room, or goes in the cabinet. A separate fire-rated room with sprinklers, fire detection and alarm transmission The plan as drawn: one 16 kWh bank next to the inverter
Fire code Applies, but a battery fire-suppression unit can replace sprinklers; detectors can connect directly to the 119 alarm transmitter Applies in full, including sprinklers and a water source Not triggered
Fits the plan Yes, with placement rules (below). Confirm with the architect that the cabinet does not count as floor area. No. It breaks the 100 m² limit, and the room is too small. Yes
Cost and complexity Medium. Many ready-made outdoor cabinets come with built-in detection and suppression. High Low
Verdict Choose this if you want 32 kWh Not practical here Simplest. You can add an outdoor cabinet later.

Do not split it into two "separate" 16 kWh systems to stay under 20 kWh. The rules are likely to look at the total installed at the site, and the local fire station decides. Ask them before planning around it (see "Who to ask" at the end).

Does the office need 32 kWh? A rough sizing check

These are planning-level estimates to show the scale, not a design calculation.

Rough figure
Solar output (A-401) 9,300 kWh/year ≈ 25 kWh/day on average. Roughly 18–22 kWh/day in winter, 30+ kWh/day in spring.
Office use on a working day, without heating or cooling (6–7 PCs and monitors, LED lighting, ventilation unit, network and hub, fridge, copier) About 15–25 kWh, mostly in daytime
Overnight and weekend standby (ventilation, hub, network, fridge) About 5 kWh per night or day
Solar left over on a sunny working day About 5–15 kWh
Electric floor heating on a cold day Probably 20–40 kWh of electricity, more than the panels make in winter

What the numbers say:

  • A 16 kWh battery already holds a typical day's leftover solar. A 32 kWh bank fills up mainly over weekends, holidays and sunny stretches.
  • In winter, the floor heating uses more than the panels produce. The battery will rarely be full, and the heat storage tank (E-102 rule 8) is the cheaper way to store extra solar as heat.
  • Under KEPCO net metering (상계거래), solar you send to the grid is credited against what you use later. That makes a battery save less money than it seems. Confirm with KEPCO how a battery affects your net-metering application.
  • What 32 kWh does buy is backup during power cuts. Essential loads (hub, network, sensors, fridge, lights, a few PCs, ventilation) draw roughly 0.5–1 kW, so the bank lasts about 16–32 hours at 16 kWh, or 1.5–3 days at 32 kWh, and longer while the sun is out. That is useful in a coastal area that gets typhoon outages. Floor heating or air conditioning would drain it much faster.

Bottom line: 32 kWh is a resilience choice, not a savings choice. If backup during outages is the goal, go with option A. If not, 16–20 kWh indoors (option C) does most of the daily job with much less regulation.

Battery bank specification (any option)

Chemistry and setup

  • LiFePO4 is the right chemistry. It is more heat-stable than the NMC lithium used in many EVs and lasts many thousands of cycles. It can still vent flammable gas and catch fire if abused, so the safety rules still apply.
  • 32 kWh is typically 2 × 16 kWh packs (51.2 V, 314 Ah ≈ 16.1 kWh each) wired in parallel, or a single 32 kWh cabinet.
  • The battery voltage must match the inverter's battery input: a 48 V-class low-voltage battery for a low-voltage hybrid inverter, or a high-voltage battery for a high-voltage inverter. Check this before buying (A-601 already flags it).
  • The battery's management system (BMS) must talk to the inverter over CAN or RS485, using a protocol the inverter lists as supported. Without this "closed-loop" link, the inverter cannot charge safely.

Wiring and protection (for the electrician)

Item Requirement
Each pack Its own DC breaker or fuse, rated for DC and able to break a DC short-circuit current (KEC 511.2.7). Lithium packs can deliver thousands of amps into a short.
Parallel connection Equal-length cables from each pack to a common busbar, so both packs share the load evenly
Current A 7 kW inverter at 51.2 V draws about 140 A, about 70 A per pack. Size the cables and busbar to the inverter's maximum battery current.
Isolation A DC disconnect switch whose open position you can see (KEC 511.2.7)
Surge A DC surge protector on the DC side (KEC 512.1.4)
Earthing Metal cases and racks earthed per KEC 140 (KEC 511.2.9)
Emergency stop Automatic stop within 5 seconds, plus a manual stop button outside the battery space that is easy to reach (KEC 512.1.4)

Physical

  • Weight: a 16 kWh pack typically weighs 110–140 kg (check the datasheet). Stand the packs on the floor or a steel stand, never hang them on a plasterboard wall.
  • Temperature: LFP lasts longest at about 15–25 °C. Its BMS blocks charging below about 0 °C, and life drops when it is kept above about 35 °C.
  • Water: keep the batteries away from water and never under pipes.

Certification (check before buying)

  • Battery: Korea requires KC 62619 for ESS battery systems from 500 Wh to 300 kWh. The system needs safety confirmation (안전확인) and the cells need safety certification (안전인증). Check the exact model number on the Product Safety Information Center site (제품안전정보센터, safetykorea.kr); a KC mark printed on the case is not enough.
  • Risk with cheap imports: low-cost imported 16 kWh packs, like the US$1,700 one in the budget, often lack KC. That can block customs clearance, the pre-use electrical inspection (사용전검사/점검) and fire insurance cover.
  • Inverter: connecting to the KEPCO grid needs a Korean-certified inverter. Confirm that the exact hybrid model is approved for grid connection in Korea.

Control hub integration (E-102)

  • Bring BMS data (charge level, cell temperatures, alarms) into the hub. The plan already monitors this.
  • Keep the charge window within the maker's range. KEC 512.1.4 forbids charging past the rated maximum. A typical setting is 10–95%, and rule 9 (battery below 20% → shed loads) stays.
  • Rule 8 (battery above 90% → heat the storage tank) works well with a larger bank.
  • Add rules for BMS alarms and over-temperature: stop charging and send an alert. If the battery-area smoke or heat detector trips: shut the system down and raise the alarm. Above 20 kWh, the alarm must also reach 119 automatically.

Placement

Option A: outdoor cabinet

Rule What it means here
Raised at least 0.3 m above ground (KEC 512.1.5) Concrete plinth. Raise it to 0.6 m if the site is on reclaimed land (간척지) or salt pans, which is common around Goheung, for example around Goheung Bay (고흥만). The site is not chosen yet, so check this.
Distance from the building, other facilities and doors KEC and the Korea Electrical Safety Corporation's inspection standard use about 1.5 m from surrounding buildings and facilities and 3 m from building entrances and escape routes. Confirm the current figures for your installation. The east wall has the storage and boiler-room doors and the north wall has the main entrance, so a north-east or south-east corner position away from those doors is likely.
Cabinet An outdoor-rated ESS cabinet (IP55 or better) with built-in detection and a battery fire-suppression unit. It should be rated for coastal salt air (a C4/C5 coating or stainless steel) and anchored for typhoons.
Temperature Shade it from afternoon sun; a north-side position runs cooler. Check that the cabinet has heating or cooling for −5 °C winters and 33 °C+ summers.
Cable route A short DC run through the wall into the boiler/electrical room, with fire-stopping where it passes through, or put the inverter in the cabinet as well

Option C: up to 20 kWh indoors in the boiler/electrical room

  • Keep the batteries away from the boiler, heat storage tank and manifold. Never put them under pipes; use a raised stand with a drip tray.
  • Vent to the outside, and keep the room cool. The heat storage tank gives off heat, so check summer room temperatures.
  • Put a smoke or heat detector in the room and wire it to the hub.
  • Keep a fire extinguisher just outside the door. Water is what cools a lithium fire, and ABC powder does not stop thermal runaway. Korean lithium-battery extinguishers (리튬배터리 전용 소화기) are also an option.
  • Mount the emergency stop button outside the east door. The room already opens to the outside (A-101), which is good for firefighter access.
  • Leave enough clear space to service the batteries, and follow the clearances in the maker's manual.

Budget lines to add to E-102

Item Note
Batteries 32 kWh About US$3,400 if the US$1,700 per 16 kWh price holds, before dangerous-goods shipping (lithium is UN3480 class 9), duty and 10% VAT. KC-certified products usually cost more.
Outdoor ESS cabinet with detection and suppression Option A only
Fire detection and 119 alarm transmitter, fire-safety design and inspection Required above 20 kWh
DC protection: breakers or fuses, busbar, surge protector, isolator, emergency stop Required at any size
Pre-use electrical inspection (사용전검사/점검) At any size; scope depends on the installation

Who to ask before deciding

  • Goheung fire station (고흥소방서), fire prevention section (예방과): how they count capacity for 32 kWh at this office, and what they require for an outdoor cabinet compared with indoors
  • Korea Electrical Safety Corporation (한국전기안전공사), local office: the pre-use inspection scope, and the separation distances for an outdoor cabinet
  • KEPCO (한전), Goheung branch: net metering with a battery, and inverter grid-connection approval
  • Architect (건축사): whether an outdoor cabinet counts toward floor area or the building coverage ratio
  • Supplier: the KC 62619 certificate for the exact battery model, the Korean grid certification for the inverter, and the BMS communication protocol
  • You: confirm 32 kWh is the energy figure (not inverter power), and whether the goal is backup or savings

Sources

Research · 바닥재 Flooring

Flooring research: Goheung office (shoes-off)

고흥사무소_바닥재_조사.md · Research date: 2026-10-27 · Goes with: 고흥사무소_계획안.pdf (Rev.0), sheet A-602

The brief

People will take their shoes off at the door, as is normal in Korea, so everyone walks around barefoot or in socks. The floor needs to:

  1. damp sound (footsteps, chairs, things being dropped)
  2. be easy on the feet (some give underfoot)
  3. not feel cold
  4. be easy to clean

What the plan says now (A-602): 7 mm tile carpet (타일카펫) over electric hot-water floor heating in the office and meeting room, and porcelain tile with a built-in entrance mat across the whole lobby. That was chosen for shoes-on use, so it needs another look.

Recommendation

Where Floor
Office, meeting room, inner lobby Cushioned PVC sheet flooring (쿠션 장판 / 층간소음 저감 바닥재), about 4.5 mm thick. Fully glued, seams sealed or welded, PVC skirting. Laid over the floor heating already in the plan.
Entry area (현관) inside the north door Porcelain tile and a built-in mat, plus a shoe cabinet (신발장). This is where shoes come off.
Toilets Keep the non-slip porcelain tile, and put out toilet slippers (화장실 슬리퍼).
Boiler/electrical room, storage Keep the epoxy. Both have outside doors, so people go in with shoes on.

This replaces the tile carpet. Cushioned sheet is soft and warm underfoot like carpet, but it can be wet-mopped and does not soak up sweat or spills. It is also the standard finish laid over ondol floor heating in Korea, so it works with the planned heating.

Three other things are needed to make it work: - Office chairs get soft-tread castors (the kind made for hard floors). Hard castors leave dents and grooves in cushioned flooring. - The control hub limits the floor surface temperature to about 27 °C. Confirm the exact limit for the product you choose. - Use 4.5 mm, not 6 mm. The extra thickness mostly reduces noise for a room below, and this building has none. 4.5 mm is firmer under chairs and lets heat through faster.

How each requirement applies to this building

1. Sound

This is a single-storey building on a ground slab, so there is no room below. That matters when reading product brochures. The headline numbers on Korean cushioned flooring (for example "경량충격음 −22 dB") measure noise carried to the apartment downstairs (층간소음). That is not a problem here.

The noise that matters in this office is:

Noise Does cushioned flooring help?
Things dropped, chair legs knocking, feet landing Yes, a lot. The foam layer takes the impact, so a dropped pen thuds instead of clattering.
Office chairs rolling Yes, as long as the chairs have soft castors.
Footsteps Already quiet barefoot or in socks. Any soft floor is fine.
Echo and voices carrying across the room Not much. Hard-surfaced floors absorb very little sound from the air. Carpet does absorb some, so the room will echo a little more if the tile carpet goes.

What this means for the plan: Keep the acoustic ceiling tiles (흡음 텍스) in the office and the acoustic panels and wood louvres in the meeting room. They now do the echo control the carpet was also doing. If the reception corner (응접) still sounds lively, add a washable rug there.

The flooring industry says much the same. Milliken, a commercial flooring maker, lists glued-down hard vinyl tile (LVT) at only about 2 dB of impact-noise reduction, against 13–19 dB for products with a cushion layer. It also says hard floors "will not absorb ambient sound in the way that textile surfaces can".

2. Easy on the feet

Cushioned sheet has a foam layer under a hard-wearing PVC top layer, so it gives a little underfoot. Korean makers sell it on comfort for knees and joints. LX's double-cushion "X-Comfort" line, for example, claims about 1.2× the cushioning and springback of its 4.5 mm 소리잠 sheet.

Engineered wood (강마루), hard vinyl tiles (데코타일/LVT) and porcelain have almost no give. KCC says its 6 mm cushioned sheet reduces noise about 58% more than ordinary 강마루 and absorbs more than twice the impact.

3. Not cold

Two separate things decide whether a floor feels cold:

  1. The floor's actual temperature. The plan already deals with this: electric hot-water floor heating in every heated room, 100 mm insulation (XPS) under the slab, and insulation around the slab edge so the floor by the windows and outside walls stays warm.
  2. How fast the material pulls heat out of a bare foot. Tile and stone feel cold even at room temperature because they draw heat away quickly. Foam-backed vinyl, cork, wood and carpet feel warmer at the same temperature. This matters most in spring, autumn and on early mornings, when the heating is off or just starting.

Cushioned sheet does well on both: its foam layer feels warm to the touch, and it is made to go over Korean ondol heating.

The trade-off is that thicker, softer layers slow heat coming up from the pipes. The European floor-heating standard (EN 1264) conservatively suggests a floor covering of no more than 0.15 m²K/W (1.5 tog). Thick carpet is the main concern there, which is why the plan specified a low-thermal-resistance carpet tile. 4.5 mm sheet passes heat more easily than 6 mm.

Surface temperature limit: Vinyl makers usually allow a maximum floor surface temperature of about 27 °C. Some allow 29 °C for some product types. This interacts with E-102 rule 8 (when there is surplus solar power and the battery is above 90%, pre-heat the storage tank and floor). Cap the floor surface temperature with a floor sensor and put the extra heat into the storage tank instead.

4. Easy to clean

Barefoot and sock-wearing offices collect hair, skin, dust and foot sweat rather than outdoor dirt. The office also has a pantry counter (탕비), where coffee gets spilled.

Cushioned sheet Tile carpet (current plan)
Daily Dry mop or vacuum Vacuum
Spills Wipe up Blot it and hope; a stained tile has to be swapped
Bare-foot hygiene Can be wet-mopped with neutral detergent Fibres hold sweat, skin oils and dust mites; needs periodic extraction cleaning
Goheung's humid summers No change Can start to smell

With a seamless, wet-mopped floor, you can see that it is clean.

The options compared

"Feels warm" here means with the floor heating off.

Option Soft underfoot Feels warm Impact noise Echo Cleaning Office chairs Floor heating Verdict
Cushioned PVC sheet, 4.5–6 mm (쿠션 장판) Good Good Good Low Good OK with soft castors Good, made for ondol Recommended
Standard PVC sheet, 2.2–3.2 mm (일반 장판) OK OK OK Low Good Good Good Budget fallback
Hard vinyl tile (LVT / 데코타일), glued Poor OK Poor (~2 dB) Low Good, but many joints Good Good Too hard and noisy for bare feet
Engineered wood (강마루) Poor OK Poor, clicky Low Good Scratches Good Common in Korea, but hard
Tile carpet (current plan) Good Good Good Best Poor Good, with hard castors OK if low thermal resistance Not ideal for shoes-off
Cork (코르크) Good Good Good Some OK, needs resealing Dents OK, per maker Nice, natural, but costly and hard to source locally, and fades in sun

Products to look at (Korean makers)

These are residential product lines. The noise figures are the makers' own claims about noise reaching the room below, so they are useful only for comparing products with each other. Product lines change, so confirm what is current with a dealer (대리점). The nearest showrooms are likely in Suncheon or Gwangju.

Maker Product Thickness What the maker claims
LX Hausys (LX Z:IN) 지아 소리잠 4.5 / 6.0 4.5 / 6.0 mm Sound-damping layer underneath; −22 / −26 dB impact noise vs bare slab (test by Daewoo E&C's research institute); environmental label (환경표지) and atopy-safe mark (아토피 안심마크)
LX Hausys (LX Z:IN) 엑스컴포트 (X-Comfort) Ask Two cushion layers (soft top, springy bottom); ~1.2× the cushioning of 소리잠 4.5T; better slip resistance; environmental label
KCC Glass / Homecc 숲 소리휴 6.0 mm High-elasticity cushion layer; about −19 dB impact noise (KCL test); environmental label; cedar-oil UV coating; stone-look patterns in 600×600 and 600×1200
Hyundai L&C 아티움 (Artium) 2.7 / 3.2 mm High-elasticity cushion layer; reduces everyday noise
Hyundai L&C 더채움 2.2 mm Cushion layer; 61 dB vs 77 dB on bare slab (company test)

How to choose: Take samples, or go to a showroom, and walk on them barefoot over a heated floor. Press a chair castor into each sample and see whether the mark comes back. Pick the thinnest one that still feels soft enough.

Changes this means for the plan (A-602)

Room Now (A-602) Proposed
사무실 (office) 타일카펫 + 바닥난방 쿠션 장판 4.5T, fully glued, seams sealed or welded, PVC skirting, + 바닥난방
회의실 (meeting room) 타일카펫 + 바닥난방 Same as the office, continuous with no threshold
로비 (lobby) 포세린 타일 + 매립 현관 매트 across the whole lobby Tile and mat only in an entry strip (현관) about 1.0–1.2 m deep inside the north door, with a 신발장 and a bench to sit on. The rest of the lobby gets the same sheet as the office.
화장실 (toilets) 논슬립 포세린 타일 + 바닥난방 No change, plus toilet slippers and a small threshold at the door to keep water in
보일러·전기실, 창고 에폭시 No change (shoes-on rooms with outside doors)
Meeting room's south sliding door to the deck (none) A slipper rack at the deck for stepping outside

Area to quote: office 49.70 + meeting room 17.48 + inner lobby about 6.5 = about 74 m². These are A-001's wall-centreline areas, so the real floor area is a little smaller. Add about 10% for cutting waste.

Make the shoes-off line flush, not a step: A traditional sunken 현관 would mean cutting into the 100 mm under-slab insulation at the door, which brings back the cold floor edge the plan is trying to avoid. A step is also a trip hazard for visitors. Instead, keep the floor level and mark the shoes-off line with the change from tile to sheet, the entrance mat and the shoe bench.

Floor build-up: The 4.5 mm sheet replaces the 7 mm carpet tile. The 2.5 mm difference can be made up in the 50 mm heating screed (방바닥 몰탈). Nothing else in the A-602 build-up changes.

Notes for the installer

  1. The screed must be dry. Vinyl sheet seals the floor, so damp screed underneath leads to glue failure, smells and mould. Run the floor heating to dry the screed before laying, raising the temperature gradually. Lower the heating while the sheet is laid and for a few days after, following the product's guide. Ask the installer to check the moisture level before they start.
  2. Fully glue the sheet (전면 접착). Do not loose-lay it with tape at the edges, as is common in homes. Rolling chairs push loose sheet into ripples.
  3. Keep seams few and sealed: heat-welded, or sealed with the maker's seam sealer. Run them away from the desk and chair areas.
  4. Edges: fit PVC skirting, or turn the sheet up the wall (굽도리), so mop water cannot get under the edge.
  5. Cap the floor temperature at about 27 °C with a floor sensor wired to the hub (see E-102 rule 8 above).
  6. Choose a low-emission product, because people will be touching it with bare skin. Ask for the environmental label (환경표지), the top HB grade (HB 최우수), and a non-phthalate plasticiser (친환경 가소제).
  7. Matte or embossed surface, and never wax or polish it. Socks slip on glossy vinyl.
  8. Chairs: use soft-tread castors. The EN 12529/12528 standards call these "type W", made for hard floors. The hard "type H" castors made for carpet dent and groove cushioned sheet. Add clear chair mats at the desks if you choose 6 mm.
  9. Heavy furniture: put wide pads under the document cabinets and the copier/plotter. Cushioned sheet dents under point loads.
  10. Sun: the 900 mm eave shades the south windows in summer, but in winter the sun reaches about 3.4 m into the room (A-301). Choose a UV-coated product so the floor does not fade near the windows.

Cleaning routine

  • Daily: dry mop or vacuum (hair and dust).
  • Weekly: damp mop with neutral detergent (중성세제).
  • Avoid: solvent cleaners, harsh bleach and steam mops (they can weaken the seams and glue), and wax or polish.
  • Entrance mat: vacuum it and lift it out to clean underneath now and then. It is the only floor that sees outdoor dirt.

Still to confirm

  • Current product lineup and the thickness of X-Comfort, from a dealer
  • Maximum floor surface temperature for the chosen product (enter it into the hub's rules)
  • Barefoot walk test on samples over a heated floor
  • Quotes with material and labour priced separately, for about 74 m² plus waste
  • Whether the office chairs being bought come with, or can take, soft castors

Sources

Rev.0

부록 · Appendix

Sheet set and the original plan

The Rev.1 sheet set first, then everything from the Rev.0 PDF: its data, the reference photos and all 12 original sheets.

Rev.1 도면 세트 · Updated sheets

The architectural sheets, updated for Rev.1

Rev.1 versions of the PDF's A-101, A-201, A-301, A-401 and A-501, with the solar deck. Click a sheet to open it full size. The same drawings appear in the review above, and the originals they replace are marked in the gallery below.

본문에서 보기
본문에서 보기
본문에서 보기
본문에서 보기
본문에서 보기
본문에서 보기
본문에서 보기
본문에서 보기

Appendix · 원본 계획안

From the Rev.0 PDF

Everything this review relies on from 고흥사무소_계획안.pdf (Rev.0, 2026.10.23), so this file stands on its own. The text is as written in the PDF. Where Rev.1 replaces something, a red tag names the change, and a blue tag points to the research note that updates it. All 12 original sheets are at the end.

개요 · Project data 표지 · A-001

30평 박공지붕 하나 아래에 사무실동과 서비스동(화장실·보일러실·창고)을 나눠 앉히고, 그 사이를 남북으로 관통하는 유리 회의실로 비웠습니다. 남측 지붕면의 태양광 7.10kW와 배터리 16kWh로 전기를 만들고 저장하며, 보일러·에어컨·공조를 하나의 제어 허브로 연동합니다. 6~7명이 근무하는 기준입니다.

위치
전라남도 고흥군 (지번 미정)
용도
사무소 · 제2종 근린생활시설
규모
지상 1층, 박공지붕 경사 20°
연면적
99.40㎡ (30.07평)
외곽 치수
14,200 × 7,000 mm (벽 중심)
최고 높이
FL +4,594 mm
구조
철골조 + 외단열, 치장벽돌 박공벽 Rev.1 → 철골 + 단열 판넬
에너지
태양광 7.10 kWp + 배터리 16 kWh Rev.1 → 10: 데크 캐노피 7.74 kWp
설비
통합제어: 냉난방 · 공조 · 습도 · 출입
근무 인원
6~7명 (근무석 6 + 대표석 1)
작성
2026.10.23 · 계획안 Rev.0

건축기준 반영 · How Rev.0 meets the brief A-001

#건축기준계획 반영 (Rev.0)
130평 규모, 박공구조 지붕외곽 14.2 × 7.0m = 99.40㎡(30.07평). 동서로 긴 단일 박공지붕, 용마루는 동서 방향이라 남측 경사면이 통째로 태양광 면이 됩니다. 연면적은 100㎡ 아래로 유지했습니다.
2사무실 면적 15평서측 사무실동 7.1 × 7.0m = 49.70㎡(15.03평). 근무석 6 + 대표석 1 + 응접. Rev.1 → 3
3화장실 2평 · 창고 3평 · 보일러룸 2평을 하나로동측 서비스동 3.3 × 7.0m = 23.10㎡ 한 덩어리. 북→남 순서로 화장실 · 보일러·전기실 · 창고를 쌓았습니다.
4사무실과 나머지를 분리, 가운데는 통로처럼 비움두 동 사이 3.8m 폭 공간이 북측 주출입에서 남측 데크까지 관통합니다. 같은 지붕 아래 있지만 입면에서는 두 매스가 떨어져 보입니다.
5비운 공간에 유리 벽체로 회의실남·북 양면 유리 커튼월. 3.8 × 7.0m = 26.60㎡ 중 남측 4.6m는 7인 회의실, 북측 2.4m는 로비. 둘 사이는 TV·수납 가구벽과 상부 유리로 나눕니다. Rev.1 → 4
6지붕에 7kW 태양광남측 경사면에 645W 모듈 11장 1열 세로 배치 = 7.10kWp. 스탠딩심 클램프로 고정해 지붕에 구멍을 뚫지 않습니다. Rev.1 → 10: 지붕 대신 데크 캐노피
7전체 사무실 건축이 문서는 평면 · 입면 · 단면 · 지붕 · 외관 · 재료까지의 계획설계 단계입니다. 인허가용 실시설계는 대지 확정 후 진행합니다.
8Central System: 온습도·배터리 모니터링, 에어컨, 보일러, 도어락, 공조보일러·전기실에 제어함(라즈베리파이 + 네트워크 스위치)을 두고 모든 센서와 기기를 한 허브로 묶었습니다. 센서·기기 위치는 E-101, 연결 구조는 E-102.
9Main System: 공기질·습도 55%·필터, 사람·온도·전기 모니터링, 원격 제어, 전기 온수 바닥난방, 출입 관리공기질·온습도·재실 센서를 실마다 두고, 전열교환기(필터)와 제습·가습기로 습도 55%를 유지합니다. 출입은 도어락 기록과 로비 카메라로 남기고, 클라우드 앱으로 원격 제어합니다. 바닥난방은 전기 온수 보일러 + 축열탱크. Rev.1 → 7
10보일러 · 공기질 시스템 · 에어컨 연동허브의 자동 연동 규칙 9개로 묶었습니다. 냉난방 동시 운전 방지, 태양광이 남을 때 바닥 축열 등은 E-102 규칙표에 있습니다.
11바닥: 사무실 타일카펫, 단열, 소음 없이, 발이 춥지 않게단열 100 + 전기 온수 바닥난방 + 바닥난방용 타일카펫, 슬래브 둘레 단열로 창가 바닥 냉기를 막습니다. 바닥 구성과 실별 마감은 A-602. 바닥재 조사 → 쿠션 장판

Items 1–7 are the 건축기준 memo. Items 8–11 are the system and floor requirements that the PDF adds.

면적표 · Areas A-001 · 벽체 중심선 기준

실치수 (m)㎡평
사무실7.1 × 7.049.7015.03
유리 회의공간3.8 × 7.026.608.05
회의실3.8 × 4.617.485.29
로비3.8 × 2.49.122.76
서비스동3.3 × 7.023.106.99
화장실3.3 × 2.06.602.00
보일러·전기실3.3 × 2.06.602.00
창고3.3 × 3.09.902.99
합계 (연면적)14.2 × 7.099.4030.07

Rev.1 changes the lobby to 3.8 × 2.0 (7.60 ㎡) and the meeting room to 3.8 × 5.0 (19.00 ㎡). Everything else is the same.

배치 가정 · Site assumptions A-001

  • 대지 정보가 아직 없어 북측 진입 · 남측 마당으로 가정했습니다. 주출입은 북측 유리면, 남측 유리면은 데크와 마당으로 열립니다.
  • 건물 장변을 정남향으로 앉혀야 태양광 효율과 겨울 일사가 가장 좋습니다. 대지 방위가 틀어지면 평면은 그대로 두고 앉히는 각도만 조정합니다.
  • 창고·보일러실 문은 동측 박공벽에 내서, 현장 자재와 설비 점검이 사무 동선과 섞이지 않게 했습니다.
  • 1평 = 3.3058㎡로 환산했습니다.

실별 계획 · Rooms A-101

사무실 · 49.70㎡

근무석 1,400×700 책상 6개를 3×2 아일랜드로 놓고, 가운데 칸막이를 세웠습니다. 대표석 1,800×800은 서측 벽을 등지고 직원석을 바라봅니다. Rev.1 → 1, 2

남측 연창 5.2m로 채광, 북측 고창(창대 1,600)으로 맞통풍. 북측 벽에 문서 수납장 · 복합기·플로터 · 탕비 카운터를 모았습니다.

천장고 2,700 평천장, 천장 속에 냉난방·조명 설비.

회의실 · 로비 · 26.60㎡

2,400×1,000 테이블에 7석. 남측 유리 슬라이딩 도어로 데크와 이어집니다.

로비 쪽 가구벽(높이 2,100) 앞면에 TV, 뒷면은 로비 수납. 위로는 유리라 경사 천장이 끊기지 않습니다. Rev.1 → 4, 5

로비에서 사무실(미닫이), 화장실, 회의실로 바로 갈라집니다.

서비스동 · 23.10㎡

화장실: 공용 세면 + 남·여 WC 부스 2개.

보일러·전기실: 전기 온수 보일러, 바닥난방 분배기, 축열탱크, 분전반, 하이브리드 인버터, 배터리 16kWh, 제어함(라즈베리파이·스위치)을 모았습니다. 외부에서 바로 점검. Rev.1 → 7, 8

창고: 외부 쌍여닫이 1,600으로 자재·장비를 바로 들이고, ㄱ자 선반과 제습기를 둡니다.

입면 · Elevations A-201

장변(남·북)은 흑회색 금속패널에 600 간격 세로 줄눈, 박공면(동·서)은 적벽돌 치장쌓기. 참고 사진의 회색 지붕 + 적벽돌 박공 조합을 그대로 따릅니다.

레벨
GL −300 · FL ±0 · 처마 +3,000 · 최고 +4,594
동측 출입
창고 쌍여닫이 1,600 · 보일러실 900
그려진 입면
남측 (마당 쪽) · 북측 (주출입 쪽) · 동측 (박공면) Rev.1: 서측 추가

단면 · Section A-A A-301

처마 900의 역할. 고흥(북위 약 34.6°)의 하지 남중고도는 78.8°. 남측 처마 900만으로 정오 무렵 유리면 전체가 그늘에 들어갑니다. 동지 남중고도는 32.0°. 해가 처마 아래로 들어와 바닥 깊이 약 3.4m까지 닿아 겨울 난방 부담을 덜어줍니다. 처마 돌출을 1m 미만으로 둬서 건축면적 산정에도 영향을 주지 않습니다. Rev.1 → 10

높이. 회의실·로비는 경사 노출천장: 벽쪽 3,000 → 가운데 4,274. 사무실·서비스동은 평천장 2,700. 지붕 두께(구조+단열) 약 320, 최고 높이 FL +4,594. Rev.1: 로비 평천장 2,400

지붕 · 태양광 · Roof and solar A-401 Rev.1 → 10: 데크 캐노피로 이동, 12장 · 10°

모듈
645W급 단결정, 2,382×1,134
수량
11장 · 1열 세로
용량
7.10 kWp
배열
12,674 × 2,382 (지붕 길이 15,400)
방위·경사
정남 · 20° (지붕 경사)
고정
스탠딩심 클램프, 무타공
인버터
7kW급, 보일러·전기실
예상 발전량
연 약 9,300 kWh
  • 예상 발전량은 일평균 발전시간 3.6시간을 가정한 개략치입니다.
  • 최적 경사(약 30°)보다 조금 눕지만 손실은 몇 % 수준이고, 지붕과 일체로 보여 외관이 깔끔합니다.
  • 용마루·처마·박공 끝에서 각각 400 이상 띄워 바람과 유지보수 여유를 뒀습니다. 같은 1열로 12장(7.74kW)까지 늘릴 여유가 있습니다.

재료 · Materials A-601 · 참고 사진 기준

  • 지붕

    징크 또는 칼라강판 스탠딩심, 짙은 회색. 처마 물받이 매립. Rev.1: 지붕 판넬 150

  • 장변 외벽

    흑회색 금속패널, 600 간격 세로 줄눈. 외단열 위 마감. Rev.1: 단열 판넬 125

  • 박공벽 (동·서)

    적벽돌 치장쌓기. 참고 사진과 같은 색감.

  • 유리 회의실

    로이 복층유리 커튼월, 흑색 알루미늄 프레임.

  • 태양광 모듈

    블랙 프레임 모듈로 지붕색과 맞춤. Rev.1: 캐노피용 유리-유리 모듈

  • 데크 · 가구벽

    남측 데크는 합성목재, 회의실 가구벽은 오크 무늬목.

참고 1: 논 옆 도로에서 본 단층 박공 건물, 지붕에 태양광
참고 1 · 지붕 태양광, 단층 박공
참고 2: 적벽돌 박공면과 회색 지붕, 쇄석 마당
참고 2 · 적벽돌 박공면
참고 3: 흑회색 세로 분절 패널 외벽과 적벽돌 박공
참고 3 · 회색 패널 + 세로 분절
참고 4: 쇄석 마당과 진입로, 울타리
참고 4 · 쇄석 마당 · 진입로

법규 기본 검토 · Code check A-601

  • 반영
    건축신고 범위

    연면적 100㎡ 이하 신축은 허가가 아닌 신고 대상입니다(건축법 제14조). 유리 회의실까지 포함해 99.40㎡로 맞췄으니, 처마나 실을 늘릴 때 100㎡를 넘기지 않도록 주의해야 합니다. Rev.1: 관리·농림지역은 200㎡ 미만

  • 반영
    용도

    사무소 500㎡ 미만은 제2종 근린생활시설입니다. 대지의 용도지역에서 허용되는지 확인해야 합니다.

  • 반영
    처마 돌출

    900으로 1m 미만이라 건축면적에 처마가 들어가지 않습니다. Rev.1 → 10: 캐노피는 건축면적 확인

  • 확인
    건폐율 · 대지 면적

    건폐율 20~40% 지역이라면 대지가 약 250~500㎡ 필요합니다.

  • 확인
    도로 · 오수

    폭 4m 이상 도로에 2m 이상 접해야 합니다. 공공하수도가 없으면 개인하수처리시설(정화조)이 필요합니다. Rev.1: M-101, 결정 E

  • 확인
    배터리 실내 설치

    리튬 배터리는 사무실 밖 보일러·전기실에 두고, 환기 · 벽과의 이격 · 리튬용 소화기를 갖춥니다. 연소식 보일러가 없는 전기 방식이라 같은 실에 둘 수 있습니다. Rev.1 → 8

  • 확인
    태양광 계통연계

    자가소비 + 한전 상계거래로 할지, 전력 판매로 할지에 따라 신청 절차가 달라집니다.

이 계획안은 기획·계획설계 단계 자료입니다. 법규 항목은 일반 기준을 요약한 것이며, 실시설계와 인허가는 건축사사무소와 고흥군청 확인을 거쳐 확정해야 합니다. 구조(철골 부재, 기초)와 태양광 하중은 구조 검토가 필요합니다.

결정이 필요한 것 · Open questions in Rev.0 A-601

  • 대지
    위치 · 방위 · 진입 방향

    지번과 진입 도로를 알면 배치도와 주차·마당 계획을 추가하고, 출입구 위치를 맞춥니다. 결정 B

  • 화장실
    남·여 분리 vs 1실 넓게

    지금은 남·여 부스 2개입니다. 방문객이 적다면 세면 포함 1실(장애인 겸용 가능)이 더 쾌적합니다. 결정 C

  • 난방
    바닥 전기 온수 DC / AC

    메모의 "DC / AC"를 두 방식으로 봤습니다. AC 전기보일러는 인버터를 거쳐 일반 전기로 돌리는 방식이라 단순하고 제품이 많습니다. DC 히터는 태양광 직류로 축열탱크를 바로 데우는 방식입니다. 계획은 AC 보일러 + 축열탱크이고, DC 직결 히터는 보조로 추가할 수 있습니다. Rev.1 → 7 · 결정 A

  • 메모
    "세까지 방법"의 뜻

    필터 옆에 적혀 있어 필터 세척·교체 방법으로 보고, 운전시간 기준 알림으로 반영했습니다. 다른 뜻이면 알려주세요.

  • 배터리
    16kw = 16kWh?

    용량(kWh)으로 보고 계획했습니다. 전압(48V/51.2V)이 하이브리드 인버터와 맞는지, 국내 설치·계통연계 시 KC 인증이 필요한지 구매 전에 확인해야 합니다. 배터리 조사 → 32 kWh

  • 창고
    반입문 크기

    지금은 1,600 쌍여닫이입니다. 인버터·모듈을 지게차나 팔레트로 들인다면 2,400 이상 오버헤드 도어로 바꿔야 합니다. 결정 D

바닥 상세 · 실내 마감 · Floor build-up and finishes A-602

  1. 타일카펫 7500×500, 바닥난방용 저열저항 제품 바닥재 조사 → 쿠션 장판 4.5
  2. 방바닥 몰탈 50전기 온수 배관 Ø16 @200 매립 Rev.1: 히트펌프 온수, M-102
  3. 경량기포콘크리트 40축열 · 배관 받침
  4. 압출법 단열재(XPS) 100두께는 에너지절약설계기준으로 확정
  5. 방습필름 0.1땅에서 올라오는 습기 차단
  6. 콘크리트 슬래브 150
  7. 쇄석 다짐
  8. 슬래브 둘레 단열창가·벽쪽 바닥 냉기(열교) 차단
실바닥벽천장
사무실타일카펫 + 바닥난방 쿠션 장판석고보드 2겹 + 흡음재 충진, 도장흡음 텍스 평천장 CH 2,700
회의실타일카펫 + 바닥난방 쿠션 장판유리 커튼월, 오크 가구벽 + 흡음 패널노출 경사천장, 목재 루버 + 흡음재
로비포세린 타일 + 매립 현관 매트, 바닥난방 현관 띠만 타일유리, 수납 가구벽노출 경사천장, 목재 루버 Rev.1 → 5
화장실논슬립 포세린 타일, 바닥난방벽 타일방수 석고보드, 환기팬
보일러·전기실에폭시 코팅불연 마감노출
창고에폭시 코팅 (자재 하중)노출노출

발이 춥지 않게

  • 사무실 · 회의실 · 로비 · 화장실 전체에 전기 온수 바닥난방을 넣습니다.
  • 슬래브 아래 단열 100과 슬래브 둘레 단열로 창가와 외벽 쪽 바닥이 차가워지는 것을 막습니다.
  • 타일카펫은 바닥난방 호환 표기가 있는 저열저항 제품으로 골라야 열이 잘 올라옵니다.
  • 로비 현관 매트가 신발에 묻은 찬 기운과 먼지를 거릅니다.

소음 없이

  • 타일카펫으로 발소리와 의자 끄는 소리를 줄이고, 사무실 천장은 흡음 텍스입니다.
  • 사무실과 로비 사이 벽은 흡음재를 채운 차음벽입니다. 회의실은 복층 유리와 흡음 가구벽으로 울림을 잡습니다.
  • 에어컨 실외기는 사무실에서 먼 서비스동 북측에 둡니다. 배터리 · 인버터 · 제어함은 사무실 밖 보일러·전기실에 있습니다.
  • 전열교환기는 저소음형으로 하고 방진 행거로 매답니다. Rev.1 → 6

설비 · 센서 · Sensors and devices E-101 Rev.1 → C-101 모니터링

기호내용
TH온도·습도 센서 · 5개
AQ공기질 센서 (CO₂·PM2.5·VOC) · 2개
PS재실(사람) 센서 · 3개
DL도어락 (출입 기록) · 주출입 · 창고 · 보일러실
CAM출입 카메라 · 로비
CT전력 계측 (분전반)
AP와이파이 AP (천장)
CP제어 패널 (벽부 태블릿)
AC에어컨: 사무실 천장형 + 회의실 벽걸이, 실외기 1대 Rev.1: 벽걸이 동측 벽
ERV전열교환기 (공조·필터), 사무실 천장 속 Rev.1 → 6
DH제습·가습기: 사무실, 창고 Rev.1: 사무실 청정제습기·가습기, 창고 제습기

배치 원칙

  • 온습도·공기질 센서는 바닥에서 1.2~1.5m, 창과 에어컨 바람을 피한 벽에 답니다.
  • 센서·AP·카메라는 제어함에서 랜선(PoE)으로 전원과 통신을 같이 받습니다.
  • 전열교환기 덕트는 사무실 천장 속으로 지나 로비와 회의실에 공기를 보냅니다.
  • 창고에도 습도 센서와 제습기를 둬서 보관 중인 인버터와 자재를 습기로부터 보호합니다.

통합제어 · Control system E-102 · Central System + Main System Rev.1 → 모니터링 · Pico 노드 + 허브

감지 · Sensors

  • 온도 · 습도: 5개 · 실마다 1개
  • 공기질: CO₂ · PM2.5 · VOC · 2개
  • 재실(사람) 감지: 사무실 · 회의실 · 로비
  • 출입 기록: 도어락 3 · 로비 카메라 · 누가 언제

중앙 제어 허브

  • 라즈베리파이 · AI 자동 규칙, 재실·출근 패턴 학습
  • 네트워크 스위치 (PoE)
  • 보일러·전기실 제어함
  • 클라우드 앱: 스마트폰 원격 제어 · 알림 · 기록 (인터넷)

제어 · Devices

  • 에어컨: 냉방 · 제습 모드
  • 전기 온수 보일러: 바닥난방 · 축열탱크 Rev.1 → 7
  • 공조 (전열교환기): 환기량 · 필터
  • 제습 · 가습기: 목표 습도 55%
  • 도어락: 원격 개폐 · 출입 권한

에너지 계통 · Energy

  • 태양광 7.10 kWp · 지붕 남측 (DC) Rev.1 → 10
  • 하이브리드 인버터: DC → AC · 충방전 Rev.1 → 8: 한 줄로 건물 전체
  • 배터리 16 kWh: BMS 잔량·온도 감시
  • 분전반: CT 전력 계측 → 에어컨 · 보일러 · 공조 · 조명 Rev.1: E-301
  • 한전 계통: 상계거래 · 비상 전원
  • 발전량 · 배터리 잔량 · 사용 전력을 허브로

자동 연동 규칙 (설정값 예시)

#조건동작
1습도 55% 초과에어컨 제습 모드, 냉방이 필요 없으면 제습기만 가동
2겨울 습도 40% 미만가습기 가동, 55%에서 정지
3CO₂ 1,000ppm 또는 PM2.5 35㎍/㎥ 초과전열교환기 강풍, 필터 운전
4필터 운전시간 누적세척·교체 알림을 앱으로 전송
5도어락 첫 출입 (출근)근무 모드: 냉난방 · 공조 시작. 평소 출근 시간을 학습해 미리 예열·예냉
6재실 없음 30분 / 마지막 퇴실절약 온도로 전환, 공조 저속, 경비 모드
7냉방과 난방 요청이 겹칠 때보일러와 에어컨이 동시에 돌지 않게 실온 기준으로 하나만 운전
8태양광 남음 + 배터리 90% 이상전기 보일러로 축열탱크·바닥을 미리 데움 Rev.1: 히트펌프로 같은 방식
9배터리 20% 미만제습기·가습기 등 급하지 않은 부하를 줄이고 알림

사람 관리 (누가 들어왔는지)

  • 도어락은 지문 · 카드 · 앱 인증으로 사람마다 기록이 남습니다. 직원별 출입 권한과 시간대를 앱에서 정합니다.
  • 로비 카메라는 주출입 쪽만 비추고, 화장실 방향은 찍지 않게 설치합니다.
  • 카메라를 달면 안내판을 붙이고 직원 동의를 받아야 합니다(개인정보보호법).

모니터링 화면 (앱 · 벽 패널)

  • 실별 온도 · 습도 · 공기질 · 재실 여부
  • 태양광 발전량, 배터리 잔량, 사용 전력, 한전 수전량
  • 출입 기록, 기기 운전 상태, 필터 알림
  • 인터넷이 끊겨도 허브 안의 규칙은 계속 돌아갑니다.

예산 항목 · Budget items E-102

항목사양 (계획)금액상태
에어컨사무실 천장형 + 회의실 벽걸이, 실외기 1대2,400,000원메모 금액
배터리16kWh (메모 표기 "16kw"), 배송 포함 배터리 조사 → 32 kWh ≈ US$3,400US$1,700메모 금액
습기기 (제습·가습기)사무실 1 + 창고 1, 목표 55%—견적 필요
보일러전기 온수 보일러 + 축열탱크 + 분배기 Rev.1 → 7—견적 필요
AI System자동 연동 규칙, 출근 패턴 학습—견적 필요
Cloud App원격 제어 · 알림 · 기록—견적 필요
Raspberry Pi중앙 제어 허브—견적 필요
Network switchPoE 스위치 (센서 · AP · 카메라 전원)—견적 필요
하이브리드 인버터배터리를 쓰려면 필요 (일반 태양광 인버터는 충전 불가)—추가 항목
센서류온습도 5 · 공기질 2 · 재실 3 · 전력 CT 1—추가 항목
도어락 · 카메라도어락 3 · 출입 카메라 1—추가 항목
전열교환기공조 · 필터, 덕트 포함—추가 항목
와이파이 AP · 벽 패널천장 AP 1 · 벽부 태블릿 1—추가 항목

메모에 금액이 있는 두 항목만 금액을 넣었습니다. "추가 항목"은 메모에는 없지만 이 시스템을 돌리려면 필요한 것들입니다.

원본 도면 · All 12 sheets 고흥사무소_계획안.pdf

Click a sheet to open it full size.

Rev.1로 대체 → A-101
Rev.1로 대체 → A-301
Rev.1로 대체 → A-401
Rev.1로 대체 → A-501